356 Alpharetta

Year Built: 1999
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

This Alpharetta, Georgia data center was purpose-built in 1999 as SunGard Availability Services' ATL-11650 single-tenant disaster-recovery and colocation facility. Unlike many of SunGard's East Coast sites, ATL-11650 did not come through the November 2001 Comdisco Availability Solutions acquisition — SunGard operated it from inception.

In 2021, the underlying real estate was sold to Mapletree Industrial Trust for $27M; 365 Data Centers continues to operate the facility as the tenant. The site transferred into 365's portfolio as part of the broader SunGard colocation portfolio acquisition.

  • (2) Conference rooms
  • (2) Break rooms
  • 24/7 Network operations center

Power

  • (4) redundant 1500 kVA UPS banks (4.15 MW total capacity)
  • (2) redundant 750 kVA UPS banks
  • (2) redundant 500 kVA UPS banks
  • 1,500 kVA Cummins Synergy generator with 4,000 gallon fuel tank
  • 1,600 kVA Baldor generator with 3,600 gallon fuel tank
  • 1,250 kVA CAT generator with 2,000 gallon fuel tank
  • 2,000 kVA Cummins Synergy generators with 4,000 gallon tanks
  • (2) 2000 kVA CAT generators with (2) 4000 gallon tanks
  • (4) independent loop-fed utility power feeds

Map and Nearby Locations

11650 Great Oaks Way
365 Data Centers Sites
Nearby Facilities

Sites within 15 miles of 356 Alpharetta

Distance Site About
0.46 miles GI Partners: Alpharetta
This was a former Lincoln Rackhouse facility. In 2025, GI Partners paid $253M for 4905 North Point Parkway, a 185K SF data center, from Lincoln Rackhouse and Principal Asset Management.
0.96 miles T5@Atlanta I
T5 Data Centers established its first metro Atlanta facility in Alpharetta in 2011. Stack acquired the Alpharetta facility in 2019 from data center operator T5.
0.98 miles STACK Atlanta ATL01
The site was previously known as T5@Atlanta
1.08 miles Stack: ATL01 Future Expansion
STACK Infrastructure is constructing a new data center facility neighboring ATL01A, at Webb Bridge Rd, Alpharetta, GA, with a substantial footprint of 133000 square feet.
1.52 miles Real Estate Data CenterInterested in this information?Contact us
Lincoln Property Company purpose-built turnkey data center in the Atlanta metro (Alpharetta). 7.3 MW critical (N+1) available, with a path to 46+ MW. Offered for lease.
1.72 miles Apotech: Atlanta 1
Operational Tier III colocation in Alpharetta (greater Atlanta): 88,000 sq ft, 11 MW utility capacity, 3.75 MW critical IT, served by two Georgia Power substations.
2.01 miles Flexential Atlanta-Alpharetta
Flexential's Alpharetta site is a former Peak 10 facility.
3.04 miles Strategic Datasphere: Alpharetta, Georgia
Strategic Datasphere has completed the acquisition of a Tier IV equivalent data center located in Alpharetta, GA. The 165,000 square foot state-of-the-art facility has 5.4 MW of 2N critical capacity that can be expanded to 8.1 MW at N+1.
3.08 miles Mapletree: 1001 Windward
In 2017, Mapletree Industrial Trust acquired 14 data centers located across the United States from Sila Realty Trust, formerly known as Carter Validus Mission Critical REIT. This data center is part of the acquisition.
8.62 miles Flexential Atlanta-Norcross 2
Flexential plans to expand its Atlanta presence through development of Atlanta – Norcross 2 at 2755 Northwoods Parkway in Norcross, Georgia. The project extends the company’s existing Norcross footprint and is designed to support enterprise and AI workloads with a targeted launch in the first half of 2028.
8.62 miles Flexential Atlanta-Norcross
The Norcross data center features a cloud node on-site.
9.03 miles Equinix Atlanta AT5
Another site Equinix acquired from Verizon.
9.95 miles Internap Atlanta: 40 Perimeter Center
In 2017, Internap (NASDAQ:INAP), a global provider of dedicated servers, hybrid cloud, colocation, and managed services, signed a long-term lease for a "Tier 3-like" data center.
9.95 miles 40 Perimeter Center: Lincoln Rackhouse
The data center is 30 minutes from Hartsfield International Airport and 20 minutes from downtown Atlanta.
10.61 miles StationInterested in this information?Contact us
An 87,000-square-foot data center in Norcross was purchased and transformed into CleanSpark’s second Bitcoin mining facility
10.95 miles Lumen Doraville 1
12.11 miles Server Farm Atlanta
Server Farm Atlanta at 305 Satellite Blvd was a former AMD data center originally commissioned in 2012 and designed to accommodate approximately 100,000 SF of additional data center space.
12.27 miles QTS Atlanta Suwanee
The QTS Atlanta-Suwanee 1 DC1 has 385,000 sq. ft. of data center and office space in the north suburbs of Atlanta
12.45 miles QTS: Suwanee 1 DC2
In 2023, QTS acquired its second data center to expand to a Suwanee campus.
15.27 miles CoreSite: Atlanta AT2
Freestanding Building on Approximately 7 Acres that is outside the 500 year flood plain
15.54 miles Equinix Atlanta AT4
Equinix acquired AT4 from Verizon in May 2017
16.31 miles Coloblox: ATL1
Coloblox Data Centers SMY1 is a data center located in Sandy Springs, occupying a gross square footage of 19,752 square feet.
16.50 miles Coloblox: ATL2
Coloblox Data Centers ATL2, also known as SMY2, is a data center situated in Sandy Springs, with a gross square footage of 21,571 square feet. The facility offers roof colocation services.
16.70 miles Grindcap: Marietta 2
DC-2 will be the second building of Grindcap's Marietta Campus in Georgia.
16.77 miles Grindcap: Marietta Campus
Grindcap plans to construct a 347,200 sq ft (32,255 sqm) campus featuring two two-story data center buildings (DC-1 at 213,600 sq ft and DC-2 at 133,600 sq ft) and a substation

356 Alpharetta Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

365 Leadership

365’s CEO is Bob DeSantis, who co-founded Xand, a data center provider acquired in 2014 by TierPoint

365 Exited Markets

In 2016 and 2017, the company exited Western Markets: Phoenix, Emeryville, Seattle, San Jose,

365 Overview

365 Data Centers is a leading provider of hybrid data center solutions in ten strategic edge markets. With data centers in Boca Raton, Buffalo, Chicago, Detroit, Fort Lauderdale, Indianapolis, Nashville, Philadelphia, New York and Tampa, the company offers a combined 195,000 square feet and 13 MW of power in place to serve clients. The company is carrier-neutral and offers Colocation, Network, IP, DRaaS, Cloud compute and storage, and Business Continuity services. 365 Data Centers is headquartered in Norwalk, Connecticut.

In September 2017, 365 Data Centers acquired hybrid data center and cloud services provider Host.net. The acquisition added Boca Raton and Fort Lauderdale facilities to 365 Data Center’s locations and allowed the company to offer enhanced services, including nationwide Metro Ethernet, long haul, and MPLS network/transport services, robust blended IP choices, direct, low latency connectivity to the NAP of the Americas and cloud/colocation hybrid solutions.

19
Facilities
13
Markets
52MW
Megawatts

News See all

Read 365 Data Centers CEO Bob DeSantis to Retire
365 Data Centers CEO Bob DeSantis to Retire

365 Data Centers CEO Bob DeSantis to Retire

October 07, 2025 365 Data Centers

Bob DeSantis, the co-founder and CEO of US operator 365 Data Centers, is to retire. The company announced the news this week, and DeSantis has initiated the transition of his responsibilities to the company’s chief revenue officer, Derek Gillespie, and CFO Steve Amelio, who has been promoted to...

Read more
Read Equifax to Decommission Data Center outside Atlanta
Equifax to Decommission Data Center outside Atlanta

Equifax to Decommission Data Center outside Atlanta

September 12, 2025 Atlanta

The City of Alpharetta last week announced that Equifax was investing $25 million to expand its Alpharetta campus, located in Fulton County. The expansion includes the renovation of the third floor of the JV White 1 building, converting it from a data center into collaborative office space. “The...

Read more
Read Atlanta City Council members propose new bill to block data center developments
Atlanta City Council members propose new bill to block data center developments

Atlanta City Council members propose new bill to block data center developments

May 10, 2024 Atlanta

Atlanta City Councilmen Jason Dozier and Matt Westmoreland have introduced bills to block data center developments around certain areas of the Georgia city near transit stops and the Beltline. “Excited to introduce legislation alongside Matt Westmoreland to address the rapid growth of data...

Read more
Read Edged Energy begins work on Atlanta data center
Edged Energy begins work on Atlanta data center

Edged Energy begins work on Atlanta data center

July 04, 2023 Atlanta

Construction on Edge Energy's Atlanta, Georgia data center is underway, with the company commencing work on July 1st. Located at Tilford Yard, the company bought the 158 acre-site back in July 2021; 70 acres will be dedicated to data center development. In January 2023, it filed a building permit...

Read more
Read 365 Data Centers Planned Tampa Campus Expansion
365 Data Centers Planned Tampa Campus Expansion

365 Data Centers Planned Tampa Campus Expansion

June 20, 2023 365 Data Centers

365 Data Centers is constructing an additional data center space at its Tampa, Florida, site. The Tampa Internet Exchange and 25 carriers are housed in the Franklin Exchange building at 655 North Franklin Street, the campus location. The company's current market footprint will double due to the...