Strata Expanse: Ironton, OH

Latest Podcast 1476 County Road 1A
Under ConstructionProspective Expansion
New facility under constructionfacility with prospective expansion planned
Operated by:

Strata Expanse: Ironton, OH

Year Planned: 2026
Utility Provider: AEP Ohio
Lot Size: 40 acres

Strata Expanse is developing an AI data center campus on 40 acres along County Road 1A in Hamilton Township, Lawrence County, Ohio, near AEP's Hanging Rock station. It bought the land in December 2025 from the Lawrence Economic Development Corporation and the county port authority. The data center uses modular buildings on 10 to 12 acres of the site.

Site History

  • In May 2026, Ohio EPA granted stormwater coverage for a ground-mount solar array at the site.
  • In March 2026, Strata Expanse announced a successful pilot at the site.
  • In December 2025, Strata Expanse bought the land and held a ribbon cutting.

Project Profile

  • Developer and operator: Strata Expanse
  • Site: 40 acres at 1476 County Road 1A
  • Power: on-site hydrogen, natural gas, solar and battery storage, with the AEP Ohio grid as backup
  • Status: under construction

Map and Nearby Locations

1476 County Road 1A
Strata Expanse Sites
Nearby Facilities

Strata Expanse: Ironton, OH Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Strata Expanse: Ironton, OH

Distance Site About
3.89 miles CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.91 miles AT&T: Ironton, OH
AT&T Ohio central office at 821 Park Avenue in Ironton, Ohio. It is the host switch for Ironton and the South Point remote.
13.14 miles TeraWulf: Muskie Expansion
13.25 miles TeraWulf: Muskie CB-1
The Muskie Data Campus is a newly announced hyperscale high-performance computing (HPC) data center project spearheaded by TeraWulf.
13.27 miles TeraWulf: Muskie CB-4
This facility is part of TeraWulf's Muskie Data Campus in Hawesville, Kentucky.
13.27 miles TeraWulf: Muskie CB-3
This facility is part of TeraWulf's Muskie Data Campus in Hawesville, Kentucky.
13.27 miles TeraWulf: Muskie CB-2
This facility is part of TeraWulf's Muskie Data Campus in Hawesville, Kentucky.
16.47 miles Verizon: Portsmouth, OH
Verizon central office at 1315 Albert Street in Portsmouth, Ohio, built and run by Frontier North before Verizon bought Frontier. It is the main switching hub for the Portsmouth area, and other carriers interconnect inside the building.

Operating Company

Operated by:

Strata Expanse develops land, power and cooling infrastructure for edge and AI computing under a model it calls Gray Space as a Service. It delivers the non-IT infrastructure, including behind-the-meter generation and modular buildings, and customers bring their own computing equipment. The company is headquartered in The Woodlands, Texas.

Its first project is an AI Center of Excellence on 40 acres in Lawrence County, Ohio. The site opened with a ribbon cutting in December 2025.

0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.