Point PrimeInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Corpus Christi, TX 78410
OperationalProspective Expansion
Fully operational facility with prospective expansion planned
Operated by: Peak Mining

Peak Mining: Corpus Christi I

Year Built: 2024
Utility Provider: AEP Texas
Lot Size: 31 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░░ Request Dataset MW
Operational Power

Peak Mining runs this bitcoin mining facility in the Saxet Energy Park, a 114-acre industrial tract on McKinzie Road across from the Lyondell plant. Bootstrap Energy assembled the park and built the facility with an AEP Texas grid connection, then sold it to Peak Mining in December 2023. Peak Mining's second site, Corpus Christi II, sits on the next parcel.

Peak Mining was a Northern Data subsidiary until November 2025, when Northern Data sold it to Highland Group Mining, a group controlled by Tether executives. An option to resell the Corpus Christi sites for AI computing lapsed in January 2026, and the new owner said in June 2026 that it will keep and use them.

Site History

  • In January 2026, Northern Data's option to buy back the Corpus Christi sites for an AI resale expired.
  • In November 2025, Northern Data sold Peak Mining, including both Corpus Christi sites, to Highland Group Mining.
  • In December 2023, Peak Mining bought the facility from Bootstrap Energy for $13.6 million.
  • In October 2023, Bootstrap Energy unveiled the $400 million Saxet Energy Park.
  • In March 2022, the City of Corpus Christi approved industrial district agreements for the park.

Map and Nearby Locations

This Facility
Peak Mining Sites
Nearby Facilities

Point TwoInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CenterInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Hut 8: Beacon Point 2
Beacon Point 2 is the second phase of Hut 8's Beacon Point AI data center campus in Nueces County, Texas.
NN milesInterested in this information?Contact us Hut 8: Beacon Point 1
Beacon Point 1 is the first phase of Hut 8's Beacon Point AI data center campus in Nueces County, Texas.
NN milesInterested in this information?Contact us Verizon: 320 E Avenue C, Robstown
Verizon's telephone central office in Robstown, Texas, a former GTE exchange.
NN milesInterested in this information?Contact us Lumen Corpus Christi 1
NN milesInterested in this information?Contact us Lumen: 5337 Bear Ln, Corpus Christi
A CenturyLink (Lumen) switch compound on Bear Lane in Corpus Christi, Texas.
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Duos: Corpus Christi, Texas
The Duos Edge AI facility in Corpus Christi is a localized, modular edge data center built to deliver low-latency computing power, high-performance network routing, and regional AI workload processing in South Texas.
NN milesInterested in this information?Contact us AT&T: 406 N Carancahua St, Corpus Christi
AT&T's Tulip central office in downtown Corpus Christi houses the area's access tandem and an AT&T Mobility switch.

Operating Company

Operated by: Peak Mining

Peak Mining is a bitcoin mining company controlled by Highland Group Mining, a group led by Tether executives. It operates a mining data center in Corpus Christi, Texas, owns a second site next to it, and holds mining sites in North Dakota and Quebec. Northern Data owned the business until November 2025.

Peak Mining History:

  • In November 2025, Northern Data sold Peak Mining to Highland Group Mining.
  • In April 2024, Peak Mining bought a second site in Corpus Christi.
  • In December 2023, Peak Mining bought its first Corpus Christi site from Bootstrap Energy.
0
Facilities
0
Markets

News See all

Read SBA Edge Opens Corpus Christi Edge Data Center And Fiber Exchange
SBA Edge has opened a multi-tenant edge data center and fiber interconnection exchange in downtown Corpus Christi, Texas. Jared Benson, director of strategic edge infrastructure at SBA, [announced ...

SBA Edge Opens Corpus Christi Edge Data Center And Fiber Exchange

July 21, 2026 Carrier-Neutral Data Center

SBA Edge has opened a multi-tenant edge data center and fiber interconnection exchange in downtown Corpus Christi, Texas. Jared Benson, director of strategic edge infrastructure at SBA, announced the launch in July, and the carrier-neutral facility's meet-me room supports data speeds up to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.