Hyperscale Data CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, West Jordan, UT 84081, United States
Operational
Fully operational facility
Operated by:

Hyperscale Data Center

Year Built: 2011
░░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

Oracle's 235,000 sqft, Tier III data center is located in the Salt Lake City metropolitan area.

Map and Nearby Locations

This Facility
Oracle Sites
Nearby Facilities

Hyperscale Data CenterInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Hyperscale Data CenterInterested in this information?Contact us

Distance Site About
0.63 miles Content Data CenterInterested in this information?Contact us
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
0.63 miles Novva: West Jordan 2
Phase Two of Novva’s West Jordan Campus project began construction in December 2023. It includes the campus’s second building, which measures 318,000 square feet (29,543 square meters).
0.64 miles Content Data CenterInterested in this information?Contact us
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
0.68 miles Novva: West Jordan Campus
The campus plan involves constructing four buildings with a total investment of $1 billion. The first phase, launched in 2023, features a 300,000-square-foot building.
0.76 miles Novva: West Jordan 3
The third building of Novva’s West Jordan campus stands as a massive 318,000-square-foot (29,543-square-meter) facility.
0.77 miles Content Data CenterInterested in this information?Contact us
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
0.92 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Aligned Energy (SLC-5) is a 450,000 sqft of data center in West Jordan, Utah.
3.70 miles Aligned SLC-03
3.72 miles Aligned SLC-02
Aligned's SLC-02 Data Center is located in West Jordan, Utah. This is the second building of Aligned's Salt Lake City data center campus with 48MW capacity.
3.73 miles Aligned Salt Lake City
Situated on 55 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 34 MW of critical capacity.
4.53 miles Flexential Salt Lake (South View)
6.67 miles Cirrus DS View 78
Announced in July 2017, the Cirrus Data Services View 78 Campus is under construction. The first phase will support 224,000 sqft and a critical IT load of 32 MW. At full capacity, the campus will expand to 160 MW and over 1 million square feet.
7.16 miles Verizon: 8871 South Sandy
Former XO site
8.68 miles Edged Energy: Bluffdale, UT
Two buildings are planned for the site.
9.06 miles DataBank SLC6
9.11 miles DataBank SLC4
9.13 miles DataBank SLC3
9.15 miles DataBank SLC5
9.18 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
9.18 miles DataBank SLC2
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
10.25 miles Aligned SLC-04
Aligned's SLC-04 is located in West Valley City, Utah, which is part of the Salt Lake City metropolitan area. SLC-04 is the first facility of approximately 270MW of new data center development that Aligned has planned.
10.68 miles Senawave
10.96 miles Voonami Salt Lake City SLC2
10.96 miles EdgeConneX Salt Lake
Within 5 miles from downtown SLC and 3 miles from SLC International Airport
10.99 miles Flexential Salt Lake (Presidents)
11.02 miles NSA Utah Data Center
11.41 miles Flexential Salt Lake (Mill Creek)
11.87 miles GammaInterested in this information?Contact us
12.83 miles Flexential Salt Lake (Cottonwood)
13.59 miles Lumen Salt Lake City 4
13.75 miles Lumen Salt Lake 1
13.81 miles Flexential Downtown Salt Lake (Delong)
14.82 miles Lumen Salt Lake 2
15.07 miles Flexential Salt Lake (Fair Park)
15.36 miles Unisys Salt Lake City
Unisys's Salt Lake City data center supports multiple Unisys business functions for IT Managed Services
15.46 miles XMission 51 E 400 S
16.00 miles DataBank SLC1
DataBank’s Downtown Salt Lake City data center is a multi-tenant colocation facility located in the heart of the downtown business district. The site is the primary carrier-hotel for the Salt Lake City area and is highly populated with a number of prominent Tier-1 and Tier-2 network providers which enter the building through multiple diverse points. The site was formerly operated by C7 before the Databank acquisition.
18.36 miles Tract: Pole Canyon Tech Park
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
18.39 miles Tract: Pole Canyon Expansion

Hyperscale Data CenterInterested in this information?Contact us Data Center Photos See all

Operating Company

Operated by:
4
Facilities
2
Markets
12MW
Megawatts

News See all

Read New Mexico Rejects Gas Pipeline for Oracle's 2.5GW Project Jupiter Data Center
Oracle’s planned 2.5GW Project Jupiter data center in Doña Ana County, New Mexico, has faced another regulatory setback. The New Mexico State Land Office rejected Energy Transfer’s permit applicati...

New Mexico Rejects Gas Pipeline for Oracle's 2.5GW Project Jupiter Data Center

July 20, 2026 Oracle

Oracle’s planned 2.5GW Project Jupiter data center in Doña Ana County, New Mexico, has faced another regulatory setback. The New Mexico State Land Office rejected Energy Transfer’s permit application for the Green Chile Project, a 17-mile natural gas pipeline extension intended to supply fuel for...

Read more
Read Oracle Lands Financing for Michigan Data Center Project
Oracle Lands Financing for Michigan Data Center Project

Oracle Lands Financing for Michigan Data Center Project

April 27, 2026 Oracle

Oracle has secured financing for its planned $16 billion data center project in Michigan, bringing months of negotiations to a close. To fund the development, Bank of America sold $14 billion in bonds tied to the project, with Pimco acquiring $10 billion, according to Bloomberg. The remaining...

Read more
Read Pimco to Provide $14bn for Oracle Michigan Data Center Project
Pimco to Provide $14bn for Oracle Michigan Data Center Project

Pimco to Provide $14bn for Oracle Michigan Data Center Project

April 08, 2026 Oracle

Pacific Investment Management Co. (Pimco) is reportedly in discussions with Bank of America Corp. to provide around $14 billion in debt financing to Related Digital for an Oracle data center in Michigan. According to Bloomberg, citing people familiar with the matter, the funding would position...

Read more
Read iXAfrica to Host Oracle Cloud Region in Nairobi, Kenya
iXAfrica to Host Oracle Cloud Region in Nairobi, Kenya

iXAfrica to Host Oracle Cloud Region in Nairobi, Kenya

February 03, 2026 Oracle

East African data center firm iXAfrica this week announced it has been selected as the host partner for the Oracle Cloud Infrastructure (OCI) region in Nairobi, Kenya.“We are delighted to be in execution mode to bring OCI to Kenya,” said Snehar Shah, CEO, iXAfrica. “With this collaboration,...

Read more
Read Blue Owl Backs Out of Funding Oracle's $10bn Michigan Facility
Blue Owl Backs Out of Funding Oracle's $10bn Michigan Facility

Blue Owl Backs Out of Funding Oracle's $10bn Michigan Facility

January 03, 2026 Oracle

Blue Owl Capital is not planning to provide financial backing to Oracle's planned data center in Saline Township, Michigan. The data center project, valued at $10 billion, is being developed by Oracle, Related Digital, and OpenAI as part of the latter's Stargate project.The campus is expected to...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?