Segra: Charlotte

465 Charles Babbage Lane

░░░░░░ Login to view SqFt Total Building Size

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

BUILDING

• Total building: Approximately 50,000 sq. ft.
• Raised floor: Approximately 30,000 sq. ft. of 36” raised floor, clear ceiling height 12’
• Expansion: Future expansion can increase total building to approximately 80,000 sq. ft. and the raised floor to approximately 50,000 sq. ft.
• Features: Loading dock space and secure mechanical area

POWER

• Total power: Fully redundant for a total of 9.6 mW at full build-out
• Generator: PowerSecure implemented in redundant quad 600 kW sets (2N + configuration). Each quad set is capable of 2.4 mW.
• UPS: Mitsubishi, implemented in redundant pairs (2N configuration)
• Main switch gear: Packaged Square D by PowerSecure. Implemented in redundant pairs (2N + configuration)
• 2N-Redunancy: All power is implemented in at least a 2N configuration and designed for continuous maintainability

Map and Nearby Locations:

465 Charles Babbage Lane
Click Map to begin Search

Sites within 15 miles of Segra: Charlotte

Show SqM
Distance Site About
12.24 miles GIGA Charlotte (Mooresville)
Located in Mooresville, NC, a northern suburb in the greater Charlotte area, the data center goes live February 2019 and will supply 60MW of capacity at 4.1₵ per kWh.
13.86 miles PowerHouse: Charlotte, NC
PowerHouse Data Center Charlotte, NC, is located close to a Duke Energy substation and could see up to 2.5 million sq ft (232,260 sqm) of data center space developed.
14.54 miles H5 Charlotte
14.54 miles Flexential Charlotte 4

Segra: Charlotte Data Center Photos

Operating Company

In 2020, Segra acquired and eventually rebranded NorthState
In 2011, North State Communications acquired DataChambers.

3 Facilities Owned
3 Markets Served
23.6 Megawatts
View Company

News

Read More News