NorthPoint: Modesto, CA

Latest Podcast 1200 Graphics Dr.
Withdrawn
Project cancelled before construction
Operated by:

NorthPoint: Modesto, CA

Year Planned: 2029
Lot Size: 45 acres

NorthPoint Development explored building a data center at the 45-acre former chemical plant site at 1200 Graphics Drive in Modesto, California.

While private lobbying efforts sparked significant community backlash over potential water and energy usage, a formal development application was never submitted to the city. Modesto's current zoning codes prohibit data centers, and the property is instead slated to house a 215,973-square-foot warehouse for Pepsi.

Map and Nearby Locations

1200 Graphics Dr.
Northpoint Development Sites
Nearby Facilities

NorthPoint: Modesto, CA Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NorthPoint: Modesto, CA

Distance Site About
1.04 miles Lumen Modesto 1

Operating Company

Operated by:

NorthPoint Development is a privately held real estate operating company that specializes in developing, acquiring, leasing, and managing Class A industrial, multi-family assets and data centers. The company invests alongside partners through various fund and venture structures to develop and acquire industrial and multi-family assets. NorthPoint differentiates itself with a data-driven approach to site acquisitions and a high level of technical expertise in engineering, architecture, and construction. Through its in-house suite of services, NorthPoint provides end-to-end expertise, leading to expedited solutions. The company continues to operate with an entrepreneurial spirit guided by its Core Values, enabling it to deliver exceptional results for team members, clients, and partners.

0
Facilities
0
Markets

News See all

Read California Resources and Bloom Energy Sign MOU For 1GW of California Fuel Cells
California Resources and Bloom Energy signed a [memorandum of understanding](https://www.globenewswire.com/news-release/2026/11/02/3393776/0/en/california-resources-corporation-announces-strategic-...

California Resources and Bloom Energy Sign MOU For 1GW of California Fuel Cells

November 03, 2026 California

California Resources and Bloom Energy signed a memorandum of understanding to jointly evaluate 1GW or more of solid-oxide fuel cell generation in California. The non-binding agreement names data centers, utilities, community choice aggregators, municipalities, and other industrial users as...

Read more
Read PG&E Data Center Pipeline Reaches 12.87GW, Defers Load Beyond 1.8GW
PG&E's data center pipeline reached 12,870 MW in September, up from 12,710 MW at the end of June. The utility furnished the figures with its [third-quarter 2026 earnings materials](https://investor...

PG&E Data Center Pipeline Reaches 12.87GW, Defers Load Beyond 1.8GW

October 28, 2026 California

PG&E's data center pipeline reached 12,870 MW in September, up from 12,710 MW at the end of June. The utility furnished the figures with its third-quarter 2026 earnings materials on October 22. Large load beyond an initial 1.8 GW sits on a list of work that will be delayed or deferred....

Read more
Read Data Center Firm Set to Acquire Former IBM Research Campus in Silicon Valley
Former IBM research campus in San Jose, California, is being acquired by data center developer Blackstart Digital. According to Mercury News, Blackstart has agreed to acquire the former IBM Almaden...

Data Center Firm Set to Acquire Former IBM Research Campus in Silicon Valley

October 06, 2026 California

Former IBM research campus in San Jose, California, is being acquired by data center developer Blackstart Digital. According to Mercury News, Blackstart has agreed to acquire the former IBM Almaden Research Center at 650 Harry Road, with financial terms undisclosed. The deal could close before...

Read more
Read Former LBNL Supercomputing Site in Oakland Slated for 20MW Data Center
A real estate firm is planning to convert a former supercomputing facility in Oakland, California, into a 20MW data center. First reported by BizJournal, Behring Cos. plans to redevelop 415 20th St...

Former LBNL Supercomputing Site in Oakland Slated for 20MW Data Center

August 12, 2026 California

A real estate firm is planning to convert a former supercomputing facility in Oakland, California, into a 20MW data center. First reported by BizJournal, Behring Cos. plans to redevelop 415 20th Street, a four-story building that once housed the Lawrence Berkeley National Laboratory’s Oakland...

Read more
Read Developer Withdraws Proposal To Convert El Segundo Hotel Into Data Center
Eight Form has withdrawn its proposal to replace a Hyatt Place hotel in El Segundo, California, with a data center. The plan involved demolishing the hotel at 750 N. Nash Street to build a five-sto...

Developer Withdraws Proposal To Convert El Segundo Hotel Into Data Center

July 15, 2026 California

Eight Form has withdrawn its proposal to replace a Hyatt Place hotel in El Segundo, California, with a data center. The plan involved demolishing the hotel at 750 N. Nash Street to build a five-story, 230,780 sq ft (21,440 sqm) facility with 50MW of capacity. Eight Form withdrew the proposal...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.