GreenScale is a new data center platform launched by investment firm DTCP. GreenScale's launch involved the acquisition of Atlantic Hub, which had been developing data center sites in Northern Ireland and Ireland.
The campus is to be located at the Foyle Port Innovation Park in Maydown, Northern Ireland. At full build-out, the 12-hectare site could total four buildings and 1 million sq ft (93,000 sqm) of technical space.
Campus Features
- Plot Size of 119,000 m2
- Located in a high security industrial area
- Located within the Foyle Port freeport area for planning purposes
- Up to 42,000 m2 of white space
- Systems designed to concurrent maintainable standard
- Sustainable materials for integration into the landscape
- Build to commence in Q2 2025
Power
- Powered from a 275kV/110kV substation within 500m of site location and shared with a 400MW gas turbine and 15MW biomass plant
- A&B 80MVA 110kV and 21MVA 33kV feeds
- Automatic Standby Generators
- Proximity to 1.5GW of renewable energy under development
- PV roof array for additional sustainable power
- Cooling systems designed to a concurrent maintainable standard of at least N+1 resilient
Connectivity
*Availability to fast abundant connectivity and low latency providers with transatlantic connections
- Independent diverse international connections to US, Europe, UK & Ireland
- Carrier neutral fibre connectivity
- Copious lit fibres and unlit fibres available
- Up to 8 Tbps of capacity available
- Reach to 100s of global POPs offering full range of international telecommunications services
- Resilience through multiple routes in and out with options for fully bred independently owned regional rings