Metrobloks: Harlingen, TX

Latest Podcast Willacy County
Planned
Future facility in planning stage
Operated by:

Metrobloks: Harlingen, TX

Short Code: MFE-A1
PUE: 1.33
Floors: 2
Lot Size: 50 acres

Metrobloks is developing a data center campus in Willacy County, Texas, northeast of Harlingen, with potential to expand to 350 MW of critical IT capacity. The facility targets the AI/HPC market with high-density computing applications backed by redundant energy sources at competitive rates. Strategic cross-border interconnectivity positions it as a hub between the USA and Mexico.

The campus sits under 40 miles from 200 S. 10th Street in McAllen, one of the most important cross-border network assets carrying internet traffic between Mexico and the United States.

Key Specifications

• Uptime Institute Tier III (concurrently maintainable or fault tolerant)
• Voltage: 480V or 415/240V to rack
• Redundancy: UPS N+1 (per hall), mechanical N+1 (lineup), N+4 (HU level)
• Cooling: Air, liquid-to-the-chip, or hybrid; 500kW (N+1) CDUs; zero chillers (DX heat units with economizer)
• PUE: As low as 1.33 regardless of scale
• White Space: 440,000 SF in 15,000 SF data halls
• Power Density: 400W/SF; rack positions of 150+kW, rows of 650kW
• Capacity increments: 1.5MW or 2MW IT; data halls scale 3MW to 12MW
• Standby Power: 2,750kW diesel generators (N+1)
• Ceiling Height: 16’ · Floors: 2 · Max rack load: 3,800 lbs
• Expansion available

Power & Land

The campus interconnects directly to both the ERCOT grid and wind generation at the Las Majadas substation under a 100% renewable power purchase agreement, a dual-fed design that maximizes stability while keeping energy costs low. On-site LNG generation provides N+1 resiliency. Additional substations are available for expansion, and the site carries no zoning regulations or restrictions.

Incentives

Texas House Bill 1223 provides state sales and use tax exemptions for qualifying data center equipment.

Map and Nearby Locations

Willacy County
Metrobloks Sites
Nearby Facilities

Metrobloks: Harlingen, TX Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Metrobloks: Harlingen, TX

Distance Site About
1.98 miles South PointInterested in this information?Contact us
Soluna and Metrobloks are developing a large AI and HPC campus across the road from Project Kati 1 in Willacy County, Texas
5.83 miles Valley PrimeInterested in this information?Contact us
Soluna's wind-powered Bitcoin and AI data center, co-located behind-the-meter with a wind farm in Cameron County (Rio Hondo / Harlingen), South Texas.
7.29 miles Eneus Energy: Harlingen RGV Campus
Representing a potential $14 billion capital investment, the project—dubbed the RGV data center—plans to house 16 data halls supported by a 765kV transmission line.
12.21 miles Lumen Harlingen 1
14.69 miles Hub UltraInterested in this information?Contact us
Soluna, a provider of crypto and high-performance computing (HPC) data centers, has secured a power supply agreement with an undisclosed developer for its Project Hedy.

Metrobloks: Harlingen, TX Data Center Photos See all

Metrobloks
Source: Metrobloks

Operating Company

Operated by:

Metrobloks develops and operates AI-ready, scalable, and sustainable colocation data centers designed to deliver the same — or better — experience than traditional build-to-suit facilities. Built to the highest hyperscaler standards, Metrobloks provides cost-efficient solutions without compromising on resilience, performance, or flexibility.

The company enables hyperscalers and enterprise customers to bring their workloads closer to end-users by deploying edge and metro-scale infrastructure in underserved urban markets. With advanced hybrid cooling, scalable from air to liquid cooling, and efficient facility management, Metrobloks ensures Tier III resilience and up to 99.999% uptime, even for the most demanding high-density GPU computing environments.

0
Facilities
0
Markets

News See all

Read Metrobloks Plans Three-building Data Center Campus in Kansas City, Missouri
Metrobloks Plans Three-building Data Center Campus in Kansas City, Missouri

Metrobloks Plans Three-building Data Center Campus in Kansas City, Missouri

March 24, 2026 Metrobloks

Metrobloks plans to build a data center campus near Kansas City, Missouri. The company announced this week that it will invest $1.4 billion in a campus in Liberty, a city north of Kansas City in Clay County.The three-building campus will total 568,800 sq ft (52,770 sqm), though full project...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?