Lumilogic: Riihimäki

Latest Podcast Junttatie 2
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Lumilogic: Riihimäki

Year Planned: 2027

Site History

  • In 2026, conversion of the former bakery building began.
  • Operations are planned to start in early 2027.

Project Profile

  • Operator: Lumilogic (Nordecon group)
  • Building: former SOK industrial bakery
  • Cooling: water cooling for the highest-density rooms

Map and Nearby Locations

Junttatie 2
Lumilogic Sites
Nearby Facilities

Lumilogic: Riihimäki Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Lumilogic: Riihimäki

Distance Site About
13.56 miles QTS: Jokela, Tuusula
QTS plans a two-building data center campus in the western employment area of Jokela, Tuusula, on a 16.8-hectare site along Vallunlenkki.
15.06 miles Winda Energy: Rastikangas, Janakkala
Winda Energy and Gi21 Capital are developing a data center campus in the Rastikangas industrial zone in Janakkala, Finland.
17.74 miles Magnora: Hämeenlinna
A new data center campus is slated for development in Finland’s MORE Industrial Park, following a joint venture agreement between Magnora ASA and the Northern Europe Energy Group (NEEG).
17.74 miles Magnora: Hämeenlinna Expansion
17.91 miles Magnora: Moreeni, Hämeenlinna
A new data center campus is slated for development in Finland’s MORE Industrial Park, following a joint venture agreement between Magnora ASA and the Northern Europe Energy Group (NEEG).
18.24 miles Nebius: Mäntsälä Finland
The data center was originally acquired from Yandex, which purchased the land in 2013 and opened it in 2014 as the company's first 'greenfield' project.
18.43 miles Prime: Järvenpää, Finland
US-based operator Prime Data Centers has announced plans for a significant expansion into Finland, targeting a 12-hectare site in the Vähänummi industrial area of Järvenpää.
18.73 miles Verne: Mäntsälä FI-VDC03
Verne has started construction of a purpose-built data centre campus in Mäntsälä’s Kapuli industrial area. The AI and high-performance computing facility is planned to begin operating in 2027, using renewable electricity supplied through Nivos and offering its waste heat for local heating projects
18.87 miles FCDC: Mäntsälä 1
FCDC is the developer of the first data center building at Gneissitie 3 in the Kapuli industrial area of Mäntsälä, which Verne operates.
18.87 miles Verne: Mäntsälä DC05
Verne has started construction of a purpose-built data centre campus in Mäntsälä’s Kapuli industrial area. The AI and high-performance computing facility uses renewable electricity supplied through Nivos and offers its waste heat for local heating projects.
18.89 miles FCDC: Mäntsälä 2
FCDC is developing a data center building at Graniittitie 6 in the Kapuli business area of Mäntsälä, on a plot leased from the municipality, for a single operator.
18.89 miles Nebius Mäntsälä 2
Nebius is developing a second data center in Mäntsälä's Kapuli business district on a separate site from its existing facility.
18.91 miles Verne: Mäntsälä DC06

Operating Company

Operated by:

Lumilogic Oy is a subsidiary of Nordecon Oy, an Espoo-based IT services and equipment company. Lumilogic was registered in 2024 and is building its first data centre at Junttatie 2 in Riihimäki, about an hour north of Helsinki. The building opened as the SOK industrial bakery and later served as an IT equipment warehouse.

The conversion is an investment of tens of millions of euros, with operations planned from early 2027. The design uses free cooling, water-based cooling for the densest rooms, backup generation and redundant fibre on separate paths, and plans for local reuse of waste heat. Lumilogic already sells virtual servers and plans colocation, bare metal, storage and an AI cloud service called Lumicloud.

Lumilogic History:

  • In September 2026, Nordecon and Lumilogic announced the conversion of the former SOK bakery in Riihimäki into an AI and HPC data centre.
  • Founded in February 2024 in Espoo.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?