Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 0.02 miles | CloudSouth |
The 6,500 square-foot facility was originally designed and built by Global Crossing in 2003 and operated as a private data center until 2011.
In 2011, the property was upgraded to serve as a public data center offering customers a fully redundant facility with one megawatt of IT capacity.
|
| 19.40 miles | Project Tango |
Proposed for 202 acres in Loxahatchee, Project Tango is set to become one of Florida's largest digital infrastructure hubs, featuring a massive 3.7 million-square-foot campus.
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
August 14, 2024
Miami
July 09, 2024
Miami
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas