E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to Podcast| Distance | Site | About |
|---|---|---|
| 0.17 miles | Carrier-Neutral Data CenterInterested in this information?Contact us |
|
| 6.63 miles | US Signal: Saint Paul |
The site was previously a OneNeck facility. In 2024, US Signal completed its acquisition of OneNeck Data Center Holdings LLC (OneNeck).
|
| 7.11 miles | QLevr: Inver Grove Heights |
In Inver Grove Heights, Minnesota, Florida-based developer QLevr has proposed a $150+ million edge data center at the former Travel Tags industrial site.
|
| 9.67 miles | H5 Minneapolis | |
| 11.24 miles | Connect Data Centers: Eagan, MN |
CLOP Eagan MN, LLC, with involvement from Oppidan, intends to develop a 61,000 square foot data center on a 22.1-acre portion of YMCA-owned land on Opperman Drive in Eagan, Minnesota.
|
| 11.51 miles | Centra: Minneapolis |
U.S. data center firm Centra has broken ground on MSP1, a new carrier-neutral data center located in Eagan, Dakota County.
|
| 12.02 miles | DataBank Minneapolis Eagan MSP2 | |
| 12.77 miles | Carrier-Neutral Data CenterInterested in this information?Contact us |
|
| 12.78 miles | Swervo: Eagan |
The 245,000-square-foot data center in Eagan, which was originally operated by Unisys (and formerly Sperry), officially changed hands in 2025.
|
| 14.32 miles | Tract: Rosemount Campus |
Data center park developer Colorado's Tract has proposed a major redevelopment project for a 447-acre site in Rosemount, located on the southern edge of the Minneapolis-St. Paul metro area.
|
| 14.33 miles | Tract: Rosemount Expansion | |
| 14.85 miles | 511 Building - Minnesota Technology Center |
|
| 14.85 miles | Cologix: Minnesota Technology Center |
Cologix's Minnesota's 5 data halls are located within the 511 carrier hotel. The 511 11th Avenue Building, located across the street from the Metrodome (home of the Minnesota Vikings) was under threat of being torn down to make room for a new stadium, but the building was saved
MIN1 is the Building's MMR
|
| 14.85 miles | Lumen Minneapolis 2 |
|
| 14.85 miles | DataBank Minneapolis MSP4 |
In 2020, DataBank acquired the facility from Zayo.
|
| 14.85 miles | Level3 Minneapolis (511 11th) | |
| 14.92 miles | Prime PointInterested in this information?Contact us |
Meta Platforms Inc., through its subsidiary Jimnist LLC, has acquired over 200 acres of land in Rosemount located along County Road 42 and Blaine Avenue in February 2025.
|
| 15.49 miles | ValleyInterested in this information?Contact us |
Meta, the parent company of Facebook, announced it will build an $800 million data center in Rosemount.
|
| 15.56 miles | Verizon: 250 Marquette |
The site is a previous XO Communications facility
|
| 15.57 miles | Cogent: 250 Marquette | |
| 15.61 miles | Lumen Minneapolis 1 |
Lumen network and colocation suite on the 7th floor of Two22, a Class A office tower in downtown Minneapolis. One of three Lumen sites in the Twin Cities metro and a long-running node on the legacy Level 3 backbone. Small-footprint carrier services and interconnection rather than a full colo hall.
|
| 15.61 miles | G42: Minneapolis |
A former downtown-Minneapolis office tower (ex-Sleep Number/Ameriprise) converted to a 21 MW data center, anchored by Core42 (G42) and owned by Cloud Capital/Arcapita since a $235M acquisition in January 2026.
|
| 15.61 miles | Cloud Capital: Minneapolis CBD |
In 2026, Cloud Capital and Arcapita acquired the data center from Legacy Investing LLC.
|
| 15.63 miles | Carrier-Neutral Data CenterInterested in this information?Contact us |
The facility is designed as a redundant carrier hub for the 511 4th Street data infrastructure.
|
| 16.30 miles | Verizon: 1200 Washington |
Former XO Communications site
|
| 16.62 miles | Edged Energy: MSP01 Expansion | |
| 16.62 miles | Edged Energy: Minneapolis MSP01 |
Edged Energy plans to construct a data center campus in Minneapolis, with operations expected to begin in Q1 2029.
|
| 18.76 miles | Connect Data Centers: Apple Valley, MN |
The Apple Valley Campus will consist of seven buildings, five of which will be dedicated data centers, encompassing a total building area of approximately 1 million square feet (92,900 sqm).
|
| 19.35 miles | Databank Minneapolis Edina MSP1 | |
| 19.35 miles | Consolidated Edina |
|
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to Podcast