Elea: Tamboré SPO3

Latest Podcast Al. Rio Negro
Operational
Fully operational facility
Operated by:

Elea: Tamboré SPO3

Short Code: SPO3
░░░ Request Dataset MW
Total Power

In 2024, Brazilian data center company Elea acquired this data center from IT services firm DXC Technology. SPO3, located in Barueri, is positioned in the most connected data center hub on the continent.

Map and Nearby Locations

Al. Rio Negro
Elea Data Centers Sites
Nearby Facilities

Sites within 15 miles of Elea: Tamboré SPO3

Distance Site About
1.28 miles Equinix São Paulo SP2
1.41 miles ODATA SP03
1.88 miles Scala: SGRUTB15
1.88 miles Scala: SGRUTB14
1.96 miles Scala: SGRUTB11
2.03 miles Scala: SGRUTB10
TB10 is a single-tenant building made for a hyperscale customer.
2.05 miles Scala: SGRUTB04
Scala broke ground on TB04 in late 2021, was completed in August 2022. The facility spans 137,222 sq ft across seven floors.
2.08 miles Scala: SGRUTB09
TB09 is a single-tenant building made for a hyperscale customer.
2.09 miles Scala: SGRUTB05
TB05 is a single-tenant building made for a hyperscale customer.
2.12 miles Scala: SGRUTB06
TB06 is a single-tenant building made for a hyperscale customer. Due to strategic decisions, TB06 and TB07 will be built as a single building.
2.15 miles Scala: SGRUTB07
TB07 is a single-tenant building made for a hyperscale customer. Due to strategic decisions, TB06 and TB07 will be built as a single building.
2.17 miles Scala: SGRUTB08
TB08 is a single-tenant building made for a hyperscale customer.
2.18 miles Scala: SGRUTB03
Located in the same condominium as SP1, in Tamboré, Barueri region, SP3 operates with an IT capacity of 9MW and has more than 9 thousand sqm of constructed area.
2.21 miles Scala: SGRUTB12
TB12 is so far a single-tenant building made for a hyperscale customer. However, as it isn't fully occupied yet, it may attend other customer demand.
2.32 miles Scala: SGRUTB01 Tamboré
TB01 is a one of the two assests acquired by Scala at the foundation. The site is has a multi-tenant profile, with hyperscalers and large enterprise customers.
2.32 miles North CenterInterested in this information?Contact us
2.38 miles NextStream: Tambore
NextStream Data Centers acquired 11 data center facilities from Nabiax in 2023. This facility is part of the acquisition.
2.54 miles Hughes Telecomunicações do Brasil
2.54 miles Equinix São Paulo SP4 (NAP do Brazil)
2.55 miles Station MaxInterested in this information?Contact us
2.63 miles Equinix São Paulo SP3
2.69 miles B3 Financial Market Hub
2.75 miles Equinix: SP7
2.77 miles Equinix Sao Paulo SP5x
2.80 miles Equinix: SP6
Equinix has opened SP6 at its Tamboré North campus in Santana de Parnaíba, expanding its São Paulo footprint with a new operational facility designed for enterprise and high-density digital infrastructure deployments.
4.49 miles Ascenty: SP2
4.57 miles Ascenty: São Paulo Campus
Ascenty's São Paulo complex data center campus is located in São Paulo, Brazil.
4.58 miles Ascenty: SP3
4.61 miles Ascenty: SPO05
Ascenty's São Paulo 5 data center is an operational facility within the company's Osasco campus, supporting enterprise and hyperscale demand in the São Paulo metropolitan region, Latin America's largest financial and corporate market.
4.64 miles Ascenty: SP4
4.65 miles Ascenty: SPO06
Ascenty is expanding its Osasco campus with the construction of São Paulo 6, adding new data center space to support growing cloud, connectivity, and enterprise demand in the São Paulo metropolitan region.
4.69 miles ODATA: DC SP04
The DC SP04 data center is OData's first facility in Brazil to feature Aligned's Delta Cube (Delta³) cooling system, enabling densities of up to 50kW per rack.
5.04 miles Carrier-Neutral Data CenterInterested in this information?Contact us
5.10 miles Carrier-Neutral Data CenterInterested in this information?Contact us
5.15 miles Carrier-Neutral Data CenterInterested in this information?Contact us
V.tal's data center arm, Tecto, is developing a new facility in São Paulo, Brazil. This upcoming data center has already secured its initial power supply and is slated to operate entirely on renewable energy.
5.30 miles Ascenty: SP8
Latin American data center firm Ascenty plans to build two new data centers in the São Paulo area, named SPO07 and SPO08.
5.35 miles Ascenty: SP7
Latin American data center firm Ascenty plans to build two new data centers in the São Paulo area, named SPO07 and SPO08.
5.36 miles ODATA DC SP01
6.67 miles Cirion São Paulo
6.68 miles HostDime: Sao Paulo
HostDime operates its own infrastructure in a partner data center in São Paulo, Brazil. This facility in São Paulo is Tier III Design Certified by the Uptime Institute.
9.17 miles Claro: São Paulo
12.15 miles Ada: Sao Paulo
Ada Infrastructure's Sao Paulo campus will consist of 4 multi-story, build-to-suit or turnkey high-density data center buildings.
12.26 miles Locaweb: Itapaiuna
12.46 miles TOTVS: NIMBVS
TOTVS expanded their data center in 2012 following a BRL 20 million investment.
12.50 miles Eletronet Sao Paulo
12.59 miles Takoda: Sao Paulo SP02
Takoda is a subsidiary of Tivit, a Brazilian-based IT services company. In 2023, Tivit spun off its data center business to create a new company named Takoda.
12.68 miles Novvacore: São Paulo
12.88 miles Scala: SGRUSP02
Located in central São Paulo, this data center encompasses a total area of 6.3 thousand sqm.
12.98 miles SBA Edge: SÃO PAULO 1
SBA Communications acquired this data center in São Paulo, Brazil for $49.2m.
13.01 miles Elea Digital: SPO1
The facility was acquired from telecoms firm Oi in 2021.
13.08 miles EastInterested in this information?Contact us
13.08 miles Takoda: Sao Paulo SP01
Takoda is a subsidiary of Tivit, a Brazilian-based IT services company. In 2023, Tivit spun off its data center business to create a new company named Takoda.
13.15 miles Serpro: São Paulo
Serpro is planning a new data center in São Paulo to expand government processing capacity and support the continued growth of Brazil's sovereign cloud infrastructure.
13.75 miles Equinix São Paulo SP1
13.96 miles MaxInterested in this information?Contact us
Microsoft launched its Brazil South Azure region in 2014, located in Campinas, São Paulo state.
14.15 miles Maxihost MH1
14.15 miles Latitude.sh: Sao Paulo

Elea: Tamboré SPO3 Data Center Photos See all

DC Ultranet Telecom located in São Paulo/SP near of downtown, with high capacity and security, connected with the major carriers in Brazil (Algar, Vivo, Embratel/Claro, Century Link, Cogent, Hurric...
DC Ultranet Telecom
Source: Baxtel

DC Ultranet Telecom located in São Paulo/SP near of downtown, with high capacity and security, connected with the major carriers in Brazil (Algar, Vivo, Embratel/Claro, Century Link, Cogent, Hurricane Electric and other carriers) direct connection with high capacity between all Equinix in Brazil and Nap of the Americas also we have connection with IX.Br and FL-Ix.

Operating Company

Operated by:

Headquartered in Rio de Janeiro, Brazil, ELEA Data Centers is Latin America’s pioneering data center infrastructure platform on a mission to accelerate a responsible digital economy across the region and beyond. Powered by 100% renewable energy and supported by a leading North American-based financial institution in addition to local financial institutions, ELEA operates a nationwide network of seven interconnected data center campuses in the most critical interconnected Tier 1 and Tier 2 cities of Brazil, with the capacity and scale to accommodate the high-density cloud and AI deployment needs of hyperscalers, and large global or local enterprises. ELEA is the world's bridgeway to Brazil, coupling local market expertise with high-performance solutions that ensure your business' successful entry into LATAM.

13
Facilities
5
Markets
28MW
Megawatts

News See all

Read Elea Digital raises $100 million in sustainability-linked debt
Elea Digital raises $100 million in sustainability-linked debt

Elea Digital raises $100 million in sustainability-linked debt

January 03, 2024 Elea Data Centers

Brazilian data center Elea Digital announced this week that it raised over $100 million in sustainability-linked debt. This fund will be used to aid ongoing organic expansion and align the company's infrastructure with international standards. Alessandro Lombardi, president of Elea Digital, said,...

Read more
Read Elea Digital launches 2.5MW expansion of its RJO1 data center
Elea Digital launches 2.5MW expansion of its RJO1 data center

Elea Digital launches 2.5MW expansion of its RJO1 data center

October 23, 2023 Elea Data Centers

Brazilian data center provider Elea Digital has launched an expansion of its data center after investing R$100 million to add 500 square meter space and 2.5MW of IT capacity to its Rio de Janeiro data center dubbed RJO1. With this expansion, the facility’s total capacity is now 5MW, enabling it...

Read more
Read Elea Digital expands Brazilian data facility with $20m
Elea Digital expands Brazilian data facility with $20m

Elea Digital expands Brazilian data facility with $20m

June 07, 2023 Elea Data Centers

Elea Digital, a Brazilian data center corporation, has invested more than $20 million in expanding its Rio de Janeiro data center. The data center in issue, RJ01, has doubled its capacity from 2.5MW to 5MW, and the additional 5,380 sq ft of data center space can accommodate up to 200 more racks....

Read more
Read Zeittec announces data center for Santos Port Authority
Zeittec announces data center for Santos Port Authority

Zeittec announces data center for Santos Port Authority

January 10, 2023 São Paulo

Zeittec is building a new facility for the Santos Port Authority (SPA), in São Paulo, following the signing of a construction contract. Work is due to commence in January, with projections that works will be completed in mid-2023.The facility is part of a wider digitalization project of Porto de...

Read more
Read Elea Digital announces sustainability-linked bond
Elea Digital announces sustainability-linked bond

Elea Digital announces sustainability-linked bond

December 09, 2022 Elea Data Centers

Brazilian data center firm Elea Digital has announced its first sustainability-linked bond. It has reportedly issued a $38 million bond to invest in more water-efficient equipment, through which it hopes to reduce its Water Usage Efficiency (WUE) to 0.31 liters and 0.2 liters per KW/h by By 2026...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?