Banorte partners with Hitachi Vantara on data center migration
March 06, 2026
Mexico City / Ciudad de México
Was a former Level3 facility before being rebranded to Cirion in 2022
| Distance | Site | About |
|---|---|---|
| 5.48 miles | KIO: MEX4 |
MEX4 joined the KIO portfolio in 2014 and has 3 floors of Data Centers with TIER III characteristics.
|
| 6.09 miles | KIO Networks MEX 3 |
One data center hall of 900 m2 (9,688 ft2), with reinforced raised floor with anti-seismic pedestal.
|
| 7.23 miles | KIO Networks MEX 1 |
Four data center halls of 600 m2 (6,458 ft2) each with reinforced raised floor and anti-seismic pedestals with structure category 4. The design of the Data Center was based on the Uptime Institute standard, specifically on a TIER III topology.
|
| 7.43 miles | KIO: MEX2 |
KIO MEX2 started operations in 2011, and has TIER IV design characteristics.
|
| 8.47 miles | BBVA Complejo Tecnologico CPD | |
| 10.00 miles | Telmex Uninet Peña Pobre | |
| 13.27 miles | KIO: MEX5 |
KIO MEX5 joined the KIO portfolio in 2014,with a technological complex with TIER III characteristics and
certification. |
March 06, 2026
Mexico City / Ciudad de México
June 12, 2025
Mexico City / Ciudad de México
June 19, 2023
Mexico City / Ciudad de México
May 25, 2023
Mexico City / Ciudad de México
March 29, 2023
Mexico City / Ciudad de México
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas