Circe Energy: Monahans

PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned
Operated by:

Circe Energy: Monahans

Site planned for 2028 and has expansions through 2030
Lot Size: 1,950 acres

Circe Energy is developing an AI and high-performance computing campus east of Monahans in Ward County, West Texas. The campus runs on its own natural-gas generation, off the grid.

Site History

  • In October 2026, the state registered the campus as a qualifying large data center.
  • In June 2026, Circe secured about 2 GW of Cummins gas generator sets for delivery from 2026 to 2030.
  • In October 2025, the state issued the site's first air authorization.

Project Profile

  • Site: about 1,950 acres along I-20.
  • Circe plans to grow the campus in phases through 2030.

Map and Nearby Locations

I-20
Circe Energy Sites
Nearby Facilities

Circe Energy: Monahans Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Circe Energy: Monahans

Distance Site About
4.12 miles AT&T: Monahans (S Allen St)
7.30 miles Barrio: Monahans
Barrio Energy operates a site on 10 acres near Monahans, Texas.
10.30 miles Point ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.62 miles Plaza PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.63 miles Cipher Digital: Black Pearl
Cipher Digital's Black Pearl site near Wink in Winkler County, Texas, began as a bitcoin mine in 2025. Cipher is converting it into a data center campus leased to Amazon Web Services.
18.77 miles Hut 8: Pyote
Hut 8's Pyote site is a bitcoin mining facility on about 23 acres in Ward County, West Texas, built by Poolin affiliate Lonestar Dream in 2022. Hut 8 agreed to buy it in Poolin's 2026 Chapter 11 sale to repurpose it for AI and HPC workloads.

Operating Company

Operated by:

Circe Energy, LLC is a Texas limited liability company headquartered in Houston and formed in March 2023. The company designs, builds, owns and operates on-site power systems, including behind-the-meter natural gas generation, combined heat and power, energy storage and microgrids. It sells the output under a power-as-a-service model to data centers, manufacturers, mining operations and utilities.

Circe is developing its West Texas AI Infrastructure Campus, a 1,950-acre site in the Permian Basin near Monahans in Ward County. The campus pairs on-site natural gas generation with HPC-ready buildings, and tenants can take powered shell, HPC colocation, build-to-suit or GPU-as-a-service space. The design uses direct-to-chip liquid cooling and waste heat recovery.

Circe Energy History:

  • In June 2026, Circe ordered natural gas generation equipment from Cummins for delivery between 2026 and 2030 to supply its West Texas campus.
  • Founded in 2023 in Houston.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.