Cipher Digital: Reveille, TX

Under ConstructionPlanned
Multi-phase construction project
Operated by:

Cipher Digital: Reveille, TX

Site planned for 2027 and has expansions through 2028
Ownership: Cipher Digital owns the building.
Lot Size: 55 acres

In 2024, Cipher Mining completed the acquisition of the Reveille data center site in Cotulla, Texas, for $2.5 million. The site is expected to be operational in 2027, with the potential for future expansion.

Map and Nearby Locations

Reveille
Cipher Digital Sites
Nearby Facilities

Cipher Digital: Reveille, TX Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cipher Digital: Reveille, TX

Distance Site About
11.25 miles RWS: Artesia Wells

Operating Company

Operated by:

Overview

Cipher Digital (NASDAQ: CIFR), formerly Cipher Mining, is a New York-based developer and operator of large-scale data center campuses in Texas. CEO Tyler Page leads the company. Cipher's footprint spans operational mining facilities (Odessa, Alborz, Bear, Chief) and a deep pipeline of HPC/AI campuses in West Texas including Black Pearl, Barber Lake, Stingray, Reveille, Mikeska, McLennan, Milsing, Ulysses, and the Colchis development.

Strategic pivot to HPC/AI (2026)

On the Q1 2026 earnings call (May 5, 2026), Cipher formally rebranded from Cipher Mining to Cipher Digital, reflecting a strategic shift to hyperscale HPC/AI hosting as the company's forward business. Bitcoin mining at Black Pearl is being wound down to redirect power and land to AI tenants.

Contracted backlog now totals approximately $9.3 billion, anchored by three hyperscale leases:

  • AWS. 15-year lease for 300 MW of HPC capacity.
  • Fluidstack / Google-backed. 10-year lease for 300 MW, with the Barber Lake facility expected to commence operations in September 2026.
  • Third hyperscaler. An additional hyperscale campus lease signed during Q1 2026.

Q1 2026 financials

  • Bitcoin mining revenue: $34.8 million (down from approximately $60 million in Q4 2025) as mining at Black Pearl is wound down.
  • Net loss: $114 million.
  • Funding: Closed a $2 billion high-yield bond for the Black Pearl HPC buildout and a $200 million revolving credit facility.

Capex direction

New capital is flowing fully to HPC/AI buildout. Existing mining capacity is treated as legacy that gets converted to hyperscale colocation as power and infrastructure are redirected to AWS, Fluidstack, and the third hyperscale tenant.

0
Facilities
0
Markets

News See all

Read Cipher Digital Extends Barber Lake Lease to 20 Years, Revenue Tops $9 Billion
[Cipher Digital](https://baxtel.com/data-centers/cipher-digital) has extended the contracted lease life of its [Barber Lake data center](https://baxtel.com/data-center/cipher-digital-barber-lake) i...

Cipher Digital Extends Barber Lake Lease to 20 Years, Revenue Tops $9 Billion

October 10, 2026 Cipher Digital

Cipher Digital has extended the contracted lease life of its Barber Lake data center in Colorado City, Texas from 10 years to 20, lifting total contracted revenue at the site from $3.8 billion to more than $9 billion. The increase, announced in late September as the first buildings near...

Read more
Read Cipher Seeks $810 Million in Senior Secured Notes for West Texas Data Center
Cryptominer-turned-HPC developer Cipher Digital is planning to raise $810 million through senior secured notes due in 2031. Most of the proceeds will fund the remaining costs of its 100MW Stingray ...

Cipher Seeks $810 Million in Senior Secured Notes for West Texas Data Center

June 09, 2026 Cipher Digital

Cryptominer-turned-HPC developer Cipher Digital is planning to raise $810 million through senior secured notes due in 2031. Most of the proceeds will fund the remaining costs of its 100MW Stingray data center project in West Texas, with about $63.6 million earmarked to reimburse prior equity...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?