Cipher Digital: Colchis, West Texas

Latest Podcast US 67 N and City Farm Rd
Planned
Future facility in planning stage
Operated by:

Cipher Digital: Colchis, West Texas

Year Planned: 2028
Utility Provider: AEP Texas
Lot Size: 620 acres

Cipher Digital is developing Colchis beside AEP Texas's Red Creek substation, off US 67 North and City Farm Road, northeast of San Angelo in Tom Green County. Cipher owns 76% of Colchis LLC. The venture bought 301.5 acres in March 2026 and holds options on about 620 acres. Cipher targets energization in 2028, after ERCOT's large-load study.

The site sits next to the planned Skybox San Angelo campus.

Map and Nearby Locations

US 67 N and City Farm Rd
Cipher Digital Sites
Nearby Facilities

Cipher Digital: Colchis, West Texas Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cipher Digital: Colchis, West Texas

Distance Site About
0.72 miles Skybox: San Angelo 1
Skybox intends to construct six four-story buildings, each spanning 248,000 square feet in San Angelo, Texas.
0.86 miles Skybox: San Angelo Expansion
Skybox intends to construct six four-story buildings, each spanning 248,000 square feet in San Angelo.
10.87 miles Cloudnium: San Angelo (SANG-1)
Cloudnium operates the SANG-1 colocation data center in a former telephone company building at 2701 South Johnson Street in San Angelo, Texas.

Operating Company

Operated by:

Overview

Cipher Digital (NASDAQ: CIFR), formerly Cipher Mining, is a New York-based developer and operator of large-scale data center campuses in Texas. CEO Tyler Page leads the company. Cipher's footprint spans operational mining facilities (Odessa, Alborz, Bear, Chief) and a deep pipeline of HPC/AI campuses in West Texas including Black Pearl, Barber Lake, Stingray, Reveille, Mikeska, McLennan, Milsing, Ulysses, and the Colchis development.

Strategic pivot to HPC/AI (2026)

On the Q1 2026 earnings call (May 5, 2026), Cipher formally rebranded from Cipher Mining to Cipher Digital, reflecting a strategic shift to hyperscale HPC/AI hosting as the company's forward business. Bitcoin mining at Black Pearl is being wound down to redirect power and land to AI tenants.

Contracted backlog now totals approximately $9.3 billion, anchored by three hyperscale leases:

  • AWS. 15-year lease for 300 MW of HPC capacity.
  • Fluidstack / Google-backed. 10-year lease for 300 MW, with the Barber Lake facility expected to commence operations in September 2026.
  • Third hyperscaler. An additional hyperscale campus lease signed during Q1 2026.

Q1 2026 financials

  • Bitcoin mining revenue: $34.8 million (down from approximately $60 million in Q4 2025) as mining at Black Pearl is wound down.
  • Net loss: $114 million.
  • Funding: Closed a $2 billion high-yield bond for the Black Pearl HPC buildout and a $200 million revolving credit facility.

Capex direction

New capital is flowing fully to HPC/AI buildout. Existing mining capacity is treated as legacy that gets converted to hyperscale colocation as power and infrastructure are redirected to AWS, Fluidstack, and the third hyperscale tenant.

0
Facilities
0
Markets

News See all

Read Cipher Digital Extends Barber Lake Lease to 20 Years, Revenue Tops $9 Billion
[Cipher Digital](https://baxtel.com/data-centers/cipher-digital) has extended the contracted lease life of its [Barber Lake data center](https://baxtel.com/data-center/cipher-digital-barber-lake) i...

Cipher Digital Extends Barber Lake Lease to 20 Years, Revenue Tops $9 Billion

October 10, 2026 Cipher Digital

Cipher Digital has extended the contracted lease life of its Barber Lake data center in Colorado City, Texas from 10 years to 20, lifting total contracted revenue at the site from $3.8 billion to more than $9 billion. The increase, announced in late September as the first buildings near...

Read more
Read Cipher Seeks $810 Million in Senior Secured Notes for West Texas Data Center
Cryptominer-turned-HPC developer Cipher Digital is planning to raise $810 million through senior secured notes due in 2031. Most of the proceeds will fund the remaining costs of its 100MW Stingray ...

Cipher Seeks $810 Million in Senior Secured Notes for West Texas Data Center

June 09, 2026 Cipher Digital

Cryptominer-turned-HPC developer Cipher Digital is planning to raise $810 million through senior secured notes due in 2031. Most of the proceeds will fund the remaining costs of its 100MW Stingray data center project in West Texas, with about $63.6 million earmarked to reimburse prior equity...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.