Year Built: 2020
PUE: 1.25
Floors: 3
Lot Size: 0 acres
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

The Chayora Tianjin Data Center Campus, launched October 2020, is China's first data center with full Uptime Institute Tier III certification for design, facility and operations.

The development has gained additional significance through a strategic partnership with EdgeConneX, a leading provider of edge and hyperscale data centers. Following EdgeConneX's strategic investment in Chayora, both companies will collaborate to deliver services from Chayora's existing Chinese data centers, with plans to expand their presence across mainland China.

Tianjin TJ1 Overview


  • Three story building – 38,258m2 total
  • Phase 1 – 15,586m2
  • Phase 2 – 22,672m2
  • Phase 1: 2 x 1,000m2 data halls (500 52U racks per hall) on stream
  • Phase 2: 2,000 racks available in an additional 4 x 1,000m2 technical white- space data halls
  • Office areas total gross 4,250m2 to be reserved in Phase 1

Power

  • Distributed redundant N+1 or 2N primary power
  • DR N+1 / 2N UPS – 15 Minute full load battery back up
  • N+1 generators – 24-hour full load on-site fuel capacity with 2 fuel supply contracts
  • 4 x 10 kV Power from different sub- stations
  • Power monitoring at the individual rack level

Networks


  • Carrier neutral, connectivity options with major carriers
  • Connectivity options to multiple cloud platforms
  • Diverse fiber entry to campus and buildings
  • Redundant carrier rooms, and redundant meet-me rooms (MMR) per floor
  • Fully redundant in-house wiring
  • <1.5ms round trip delay to Beijing CBD (route dependent)

Map and Nearby Locations:

No. 17 Tongjin Road
Chayora Sites
Nearby Facilities

Sites within 15 miles of Chayora Tianjin Campus

Distance Site About
0.11 miles Chayora: TJ7
TJ7, situated in Tianjin's Beichen District, is part of Chayora's Tianjin Campus. This data center facility may comprise 2 or 3 separate buildings and is designed to accommodate 2000-3000 racks.
0.13 miles Chayora: TJ3
Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.
0.17 miles Chayora: TJ2
Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.
0.22 miles Chayora: TJ4
Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.
0.24 miles Chayora: TJ5
Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.
0.29 miles Chayora: TJ6
Located in Tianjin's Beichen District, this facility is part of Chayora's Tianjin Campus with a designed capacity of 3000-4000 racks.

Chayora Tianjin Campus Data Center Photos (See all)

Gate Entrance
Source: Chayora
Main Lobby
Source: Baxtel
Corridor
Source: Baxtel
UPS Room
Source: Baxtel
Adiabatic Free Cooling Chiller
Source: Baxtel

Operating Company

Operated by:

Chayora is developing hyperscale data centre sites in key cities across China.

10
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?