CDC: Gregadoo Campus

Latest Podcast 216 Ashfords Rd
Planned
Future facility in planning stage
Operated by:

CDC: Gregadoo Campus

Site planned for 2030 and has expansions through 2036
Utility Provider: Transgrid

Site History

  • September 2026: CDC submits a scoping report to the NSW Government. The State Significant Development application (SSD-144289240) runs alongside a planning proposal to rezone the rural land.
  • October 12, 2026: Wagga Wagga City Council authorises the sale of the site to CDC.
  • October 14-15, 2026: Community information sessions in Wagga Wagga.

Project Profile

  • Developer: CDC Data Centres
  • Land: 103.8 hectares, with about 63.4 hectares for the campus. The site is grazing land zoned RU1 Primary Production, sold by Wagga Wagga City Council.
  • Buildings: Four single-storey data centre buildings with about 189,300 m² of combined gross floor area.
  • Investment: About AU$15 billion.
  • Backup power: Up to 384 diesel generators with about 6,400 tonnes of fuel storage.
  • Cooling: Closed-loop system. CDC is still choosing between evaporative and mechanical options.
  • Water and wastewater: A proposed water main extension from Lake Albert, and on-site wastewater treatment.
  • Community: Up to AU$225 million in benefits. This includes a voluntary planning agreement worth at least 1% of development cost, plus AU$75 million for community initiatives.
  • Status: Concept phase. The NSW Government is preparing the environmental assessment requirements (SEARs).

Utility

  • Transgrid's Wagga 330 kV substation sits about 1.3 km north of the site.
  • CDC plans a dedicated 330 kV connection, two on-site substations, and a STATCOM. CDC funds the connection costs.
  • The Wagga node connects to Project EnergyConnect and sits near the new HumeLink network.

Map and Nearby Locations

216 Ashfords Rd
Canberra Data Centres (CDC) Sites
Nearby Facilities

CDC: Gregadoo Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CDC: Gregadoo Campus

Distance Site About
0.18 miles CDC: Wagga Wagga Campus
CDC Data Centres is exploring an ambitious AU$15 billion (US$10.4 billion) plan to develop a gigawatt-scale campus in Gregadoo, on the southeastern fringe of Wagga Wagga in regional New South Wales.
1.07 miles IREN: Redbank
Redbank is IREN's proposed AI data centre campus at Gregadoo, about 10 km south of Wagga Wagga in the NSW Riverina. The site lies west of the Gregadoo Waste Management Centre, next to Transgrid's Wagga 330 kV substation, on land that already carries high-voltage transmission lines. IREN plans a staged build of several buildings over six to eight years.
6.74 miles LEDC: Wagga Wagga

Operating Company

Operated by:

Canberra Data Centres (CDC) is a carrier neutral data centre provider established in 2007.

0
Facilities
0
Markets

News See all

Read IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured
IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional [New South Wales](https://baxtel.com/regions/new-south-wales). The Nasdaq-listed o...

IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured

October 14, 2026 IREN

IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional New South Wales. The Nasdaq-listed operator took the proposal to the local community ahead of a scoping report due to the state's Department of Planning, Housing and Infrastructure...

Read more
Read Firmus and CDC Scrap 1.6GW Project Southgate With Just 42MW Built
[Firmus Technologies](https://baxtel.com/data-centers/firmus-technologies) and [CDC Data Centres](https://baxtel.com/data-centers/canberra-data-centres-cdc) have scrapped Project Southgate, their p...

Firmus and CDC Scrap 1.6GW Project Southgate With Just 42MW Built

October 06, 2026 Firmus Technologies

Firmus Technologies and CDC Data Centres have scrapped Project Southgate, their plan to build up to 1.6GW of AI factories across Australia, after deploying about 42MW, roughly 2.5 percent of the original target. "Firmus and CDC mutually agreed earlier this year not to proceed with the previously...

Read more
Read CDC Purchases Land in Australia For a Second Facility in Sydney
CDC Purchases Land in Australia For a Second Facility in Sydney

CDC Purchases Land in Australia For a Second Facility in Sydney

May 19, 2023 Canberra Data Centres (CDC)

The Australian company CDC Data Centres has purchased a 17-hectare plot in Sydney. According to RealEstateSource, the Australian real estate investment fund Roberts Jones Funds and Development purchased Burra Park in Badgerys Creek, west Sydney, for $99 million this week. Robert Jones mentions...

Read more
Read CDC Data Centres emissions data released after claim rejected by watchdog
CDC Data Centres emissions data released after claim rejected by watchdog

CDC Data Centres emissions data released after claim rejected by watchdog

May 10, 2023 Canberra Data Centres (CDC)

According to a report by Innovation Aus, CDC Data Centres request to have its greenhouse gas emissions data withheld from public release has been rejected by Clean Energy Regulator, Australia's clean energy watchdog. The data center company was seeking to have its indirect emissions and energy...

Read more
Read CDC expands presence in Australia
CDC expands presence in Australia

CDC expands presence in Australia

December 13, 2022 Canberra Data Centres (CDC)

CDC Data Centres has announced expansion plans in Australia. The company has said it will expand its Sydney campus with two new buildings, adding more than 100MW, with the new additions seeing $1 billion in investment. This follows the official opening of its new $1.5 billion data center campus...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?