Street Address
Interested in this information? Contact us
Under ConstructionPlanned
Multi-phase construction project
Operated by:

BUZZ HPC: Toronto Campus

Site planned for 2027 and has expansions through 2031
Ownership: HIVE Digital Technologies Ltd owns the building.
Lot Size: 25 acres

Buzz HPC, a subsidiary of HIVE Digital Technologies, has secured two parcels of land totaling 25 acres in the Greater Toronto Area (GTA) for CA$58 million (US$42.21m) to construct a data center dedicated entirely to artificial intelligence workloads.

Backed by a CA$3.5 billion (US$2.55bn) investment and a pre-allocated power infrastructure, the facility will serve as the anchor site for Buzz’s Canadian AI platform. Located strategically within the Toronto-Waterloo technology corridor, the site is designed to host over 100,000 GPUs at full build-out, significantly expanding Canada’s sovereign AI capacity. The project is targeting a go-live date in the second half of 2027 and is expected to generate at least 800 construction jobs.

In alignment with HIVE’s sustainability initiatives, the data center will utilize an eco-friendly, closed-loop cooling system that requires no water use. This expansion advances HIVE’s global footprint past 850MW and marks a major milestone in the company’s strategic pivot toward high-performance computing (HPC) and enterprise AI infrastructure.

Map and Nearby Locations:

This Facility
HIVE Digital Technologies Ltd Sites
Nearby Facilities

BUZZ HPC: Toronto Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Tower Pro

Distance Site About
4.55 miles Equinix Brampton TR6
4.59 miles Equinix Brampton TR7
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
5.24 miles Excell IT
5.83 miles 11:11 Systems: Mississauga, ON
11:11 Systems acquired the facility from Sungard Availability Services (Sungard AS) in November 2022.
6.02 miles CentriLogic Mississauga (North)
18″ raised floor with hot/cold aisle configuration 24/7/365 Security & Multi-level Biometric Access Control
6.28 miles Centersquare: Mississauga YYZ1
One story building Raised floor (inches) = 24 and 30
7.92 miles Urbacon: Toronto West DC7
DC7 is situated in a prime Toronto location accessible by transit and close to Canada's largest international transportation hub.
7.94 miles Prologis: Mississauga
Prologis has filed to develop a 220,000 sq ft data center in Mississauga, Ontario, through a zoning amendment application, with the project still in early planning and potentially competing with alternative industrial development options.
8.22 miles Hut 8: Mississauga DC
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
8.54 miles Cogent Mississauga
8.72 miles CentriLogic Mississauga (South)
9.82 miles Hyperscale Data Center Request Dataset
Microsoft is investing $69 million CAD in a new data center campus in Vaughan, Ontario.
9.84 miles Hyperscale Data Center Request Dataset
This facility is part of Microsoft's YT011 data center campus in Vaughan, Ontario.
10.74 miles Hyperscale Data Center Request Dataset
Microsoft is planning to build a new data center on the site of a now-closed Lowe’s store between Islington Avenue and Highway 401 in Toronto, Canada.
12.01 miles ServerFarm Toronto TOR1
Site is approximately 7.14 acres Three 10,000 SF data halls with ample office and conference space
12.34 miles Compass: North York
12.50 miles 1 Century Place (TOR1) Digital Realty
This site was originally operated by Dupont Fabros as TOR1 before being acquired in Sept 2017 by Digital Realty Trust in a $7.6 Billion 12 datacenter deal. Located just outside the city of Toronto in nearby Vaughan, this Canadian wholesale data centre spans over 66,000 square metres (711,000 square feet) with a critical power capacity of up to 46 megawatts. The site was the former Toronto Star Printing plant.
12.58 miles eStruxture TOR-3 (Etobicoke)
12.95 miles Compass Toronto Etobicoke
13.21 miles Canada15Edge Toronto West
13.21 miles Whipcord Edge: TDC01
15.43 miles Canada Cloud Data Centre
15.93 miles Hut 8: Vaughan DC
Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.
17.17 miles Beanfield 23 Fraser
17.64 miles Telehouse: 905 King Street West
Telehouse has acquired three data centers in Canada, marking its entry into the country.
17.64 miles Contegix Toronto
17.64 miles Beanfield 905 King St
17.64 miles Cologix Toronto TOR2
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
17.65 miles Cologix TOR3
18.70 miles ILAP 210 Sheppard
18.80 miles Telehouse: 250 Front Street West
Telehouse has acquired three data centers in Canada, marking its entry into the country.
18.85 miles CORE Brampton
55H, in partnership with Core Data Centers, has announced a phased expansion of its Brampton, Ontario data center. This expansion is designed to meet the growing demands of AI clients.
18.96 miles Qscale: Toronto
Qscale, a Canadian company, plans to build a multi-billion-dollar data center in Toronto.
18.96 miles Crypto Mining Data Center Request Dataset
Crypto firm Hive Digital (through its subsidiary Buzz High Performance Computing Inc.) has acquired a data center in Toronto, Canada.
18.97 miles eStruxture TOR-2
18.98 miles Hive DC: Toronto
Hive Data Center's highly connected TOR-1 site has extensive connectivity to Canada’s largest city and direct paths to the US Mid-west.
18.99 miles Cologix Toronto TOR1
Cologix operates seven discrete Toronto data centres at 151 Front Street West (TOR 1), Canada’s largest and most important carrier hotel.
18.99 miles Neutral Data Toronto
18.99 miles Equinix Toronto TR1
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
19.00 miles Amanah: TOR1
Located on the 3rd floor, TOR 1 is Amanah's primary data center suite.
19.00 miles Digital Realty 151 Front
19.00 miles eStruxture TOR-1
19.00 miles Priority Colo TOR1
19.00 miles Amanah: TOR2
Situated on the 6th floor of the same building, TOR 2 serves as a high-availability extension of TOR 1.
19.01 miles Telehouse: 151 Front Street West
Telehouse has acquired three data centers in Canada, marking its entry into the country.
19.05 miles Equinix Toronto TR4
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
19.07 miles CenriLogic Toronto
19.09 miles TNW Toronto

Campus Beta Data Center Photos (See all)

Operating Company

Operated by:

HIVE Digital Technologies Ltd. went public in 2017 as the first cryptocurrency mining company with a green energy and ESG strategy. HIVE mines Bitcoin and Ethereum using primarily clean, cheap hydroelectric power in Canada, Sweden, and Iceland.

13
Facilities
0
Markets
375MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your