Bitdeer: Fox Creek, AB

Under Construction
New facility under construction
Operated by:

Bitdeer: Fox Creek, AB

Year Planned: 2027
Ownership: BitDeer owns the building.
Lot Size: 19 acres

Bitdeer’s Fox Creek Campus is a 19-acre digital infrastructure project scheduled to energize in Q2 2027.

Located in the Municipal District of Greenview No. 16, Alberta, the facility was acquired as a fully permitted site from Kiwetinohk Energy and operates under the province's "bring-your-own-generation" framework. This setup couples an on-site natural gas power plant directly with the data center to run "behind the fence" without drawing operational electricity from the local grid.

While the campus will initially host Bitcoin mining workloads, it is engineered with a closed-loop dry-cooling system designed to pivot into high-performance computing and AI applications. Additionally, the site maintains a physical interconnect to the AESO grid, providing the operational flexibility to curtail computing operations and feed power back into the electricity system during periods of peak regional demand.

Map and Nearby Locations

Fox Creek
BitDeer Sites
Nearby Facilities

Bitdeer: Fox Creek, AB Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Bitdeer: Fox Creek, AB Data Center Photos See all

Operating Company

Operated by:

Bitdeer is a leading miner sharing service platform, where users are provided with a full range of cryptocurrency mining and cloud hosting solutions.

16
Facilities
10
Markets

News See all

Read Avax One Targets 10MW Behind-the-Meter Data Center in Alberta
Avax One Targets 10MW Behind-the-Meter Data Center in Alberta

Avax One Targets 10MW Behind-the-Meter Data Center in Alberta

April 11, 2026 Alberta

Cryptocurrency firm Avax One Technology has signed a front-end engineering and design (FEED) proposal for a 10MW off-grid, natural gas-powered AI and high-performance computing (HPC) data center at the 4-31 Battery site in Alberta, Canada. The FEED study will be led by BlueFlare Energy Solutions...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?