Azur: Champagnier

Latest Podcast 283 Route des Lavières
Planned
Future facility in planning stage
Operated by:

Azur: Champagnier

Lot Size: 3 acres

The Azur Datacenter Champagnier facility is a planned data center in Champagnier, in the Isère department near Grenoble in southeastern France, to be developed by retrofitting an existing industrial complex of offices and production space. The site is being acquired from French hydrogen infrastructure maker HRS through a sale-and-leaseback arrangement, under which HRS remains on-site as a long-term tenant, continuing its manufacturing operations alongside the data center build-out. The project reflects Azur Datacenter's strategy of rehabilitating existing buildings, and is paired with a prospective industrial partnership drawing on HRS's hydrogen-based power generation expertise for energy-efficient design. As of the most recent reporting, the transaction was at a preliminary stage, expected to complete by the end of 2026 subject to a building permit and environmental approvals under France's ICPE industrial-site regulations.

Map and Nearby Locations

283 Route des Lavières
Azur Datacenter Sites
Nearby Facilities

Sites within 15 miles of Azur: Champagnier

Distance Site About
4.09 miles DataOne: Grenoble
DataOne, a subsidiary of BSO, acquired the Grenoble data center from DXC Technology in 2024. BSO has confirmed DXC is set to remain as a customer of the site.
6.41 miles Cogent Grenoble

Operating Company

Operated by:

Azur Datacenter is an innovative hosting provider and datacenter manufacturer, specializing in advanced cooling solutions. They offer colocation, hosting, and cutting-edge cooling technologies including Direct Liquid Cooling (DLC) and Immersion Cooling.

The company addresses the growing challenge of cooling high-performance computing equipment. With processor power consumption exceeding 200W and some reaching 400W, traditional air-cooled datacenters struggle to manage heat effectively. GPU units often operate above 300W, and the trend shows no signs of slowing.

Azur Datacenter has already implemented next-generation cooling solutions, such as a Direct Liquid Cooling (DLC) high-performance computing cluster reaching 72kW/rack for a client in March 2021. They anticipate rack power density to double every seven years, with projections of over 70kW per rack by 2022.

The company positions itself at the forefront of datacenter technology, offering "Direct Liquid Cooling ready" and "Immersion Cooling ready" solutions to meet the evolving needs of IT professionals facing cooling challenges in traditional datacenters.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Pau to Build 1MW Data Center in Push for Digital Sovereignty
The French city of Pau is building a €3 million ($3.4 million), 1MW data center to support local businesses and government agencies. Funded by the Pau Béarn Pyrénées Agglomeration (CAPBP), which co...

Pau to Build 1MW Data Center in Push for Digital Sovereignty

July 07, 2026 France

The French city of Pau is building a €3 million ($3.4 million), 1MW data center to support local businesses and government agencies. Funded by the Pau Béarn Pyrénées Agglomeration (CAPBP), which comprises 31 communes in the Pau region, the facility will be operated by French data center company...

Read more
Read Le Bourget Data Center Plan at Former H&M Site Faces Potential Mayoral Block
A planned data center in Le Bourget, France, could be blocked by the commune’s newly elected mayor. Mehdi Nezzar, who took office earlier this year, is calling for the cancellation of Segro’s 75MW ...

Le Bourget Data Center Plan at Former H&M Site Faces Potential Mayoral Block

July 01, 2026 France

A planned data center in Le Bourget, France, could be blocked by the commune’s newly elected mayor. Mehdi Nezzar, who took office earlier this year, is calling for the cancellation of Segro’s 75MW project at a former H&M warehouse in the northeastern Paris suburb. A building permit was...

Read more
Read Data4 Unveils Plans for €5bn, 700MW AI Data Center Project in Northern France
Data4 has confirmed plans for a €5 billion ($5.8 billion), 700MW data center campus in Escaudain, set to be the company's largest facility to date. The campus will be developed on the site of the f...

Data4 Unveils Plans for €5bn, 700MW AI Data Center Project in Northern France

June 15, 2026 France

Data4 has confirmed plans for a €5 billion ($5.8 billion), 700MW data center campus in Escaudain, set to be the company's largest facility to date. The campus will be developed on the site of the former Usinor steelworks in the Hauts-de-France region. “We are delighted to bring our project to...

Read more
Read STMicroelectronics signs 43MW PPA with TSE in France
STMicroelectronics signs 43MW PPA with TSE in France

STMicroelectronics signs 43MW PPA with TSE in France

December 02, 2025 France

European chip manufacturer STMicroelectronics has signed a 15-year Power Purchase Agreement (PPA) with French solar developer TSE Energy. The PPA will see TSE supply ST with power generated by three solar parks in France, with a combined capacity of 43MW. The contract will commence in 2027 and...

Read more
Read Thésée Datacenter Plans 50MW Expansion of Campus outside Paris
Thésée Datacenter Plans 50MW Expansion of Campus outside Paris

Thésée Datacenter Plans 50MW Expansion of Campus outside Paris

November 29, 2025 France

Thésée Datacenter is adding 50MW of data center capacity to its campus in Aurbgenville, outside Paris, France. The firm will invest an initial €60 million ($69.6m) into the project as part of a total investment expected to reach €500m ($579.9m).It intends to expand the site with data center...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?