Aventus: Marshfield (715)

Latest Podcast 901 E Commerce Dr
OperationalPlannedProspective Expansion
Fully operational facility with future phases planned and prospective expansion planned
Operated by:

Aventus: Marshfield (715)

Site was first built in 2010 and has expansions through 2027
Utility Provider: Marshfield Utilities
Lot Size: 8 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

Aventus 715 is a colocation facility in Marshfield, in central Wisconsin midway between Minneapolis and Milwaukee. Its purpose-built 20,000 sq ft building has two 3,600 sq ft data vaults and 320 cabinet positions. Aventus Data Centers is a division of Vincent Companies.

Site History

  • Sept 2023 — Acquired by Aventus Data Centers (division of Vincent Companies)
  • 2010 — Built for Marshfield Clinic; online 2010 (2N, Vault 1 live)

Project Profile

  • Power: No behind-the-meter generation. 2N redundancy — dual 2,500 KVA utility feeds, dual full-load diesel generators, dual UPS.
  • Density: 5 kW/cabinet design, supports 10-15 kW
  • Carriers: Spectrum, WIN, NSight, Frontier, Solarus, WisNET; two disparate carrier entrances; dark fiber available
  • Certifications: Uptime Institute Tier III, SOC 2 Type 2, HIPAA, FDIC, Wisconsin Act 73
  • Anchor tenant: Marshfield Clinic (healthcare)

Map and Nearby Locations

901 E Commerce Dr
Aventus Data Centers Sites
Nearby Facilities

Aventus: Marshfield (715) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Data Center Development in Wisconsin delayed
Data Center Development in Wisconsin delayed

Data Center Development in Wisconsin delayed

September 26, 2025 Wisconsin

A data center development in Menomonie, Wisconsin, has been delayed. In a meeting on September 22, Mayor Randy Knaack said that he had drafted a memo to developer Balloonist LLC stating that the city was no longer interested in pursuing the project.“I’m not thrilled about the data center coming...

Read more
Read Northwestern Mutual Abandons Franklin, Wisconsin Facility And On-site Data Center
Northwestern Mutual Abandons Franklin, Wisconsin Facility And On-site Data Center

Northwestern Mutual Abandons Franklin, Wisconsin Facility And On-site Data Center

February 22, 2023 Wisconsin

Northwestern Mutual is abandoning its campus in Franklin, Wisconsin, on the outskirts of Milwaukee, as part of a $500 million effort to relocate to an office complex in downtown Milwaukee. Per the Milwaukee Journal Sentinel, this is partially due to the fact that the corporation no longer needs...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.