Street Address
Interested in this information? Contact us
Operational
Fully operational facility
Operated by:

Atlas Power: Butte

Lot Size: 200 acres
░░░░ Request Dataset MW
Total Power

Atlas Power commissioned its first 65MW of capacity through the repurposing of the former Mike Mansfield testing facility in Butte, Montana and maintains a track record of high-quality facilities. With over 200 acres of land, the facility can be expanded to fully utilize the 125MW substation.

Map and Nearby Locations:

This Facility
Atlas Power LLC Sites
Nearby Facilities

Sites within 15 miles of Valley One

Distance Site About
5.89 miles Thornton Labs - Butte
8.45 miles Sabey: Butte, Montana
Sabey Data Centers has officially withdrawn its proposal to develop a campus in Butte, Montana, after losing its intended site to REC Silicon.

Valley Alpha Data Center Photos (See all)

Entrance to the facility
Source: Baxtel

Operating Company

Operated by:
2
Facilities
2
Markets
145MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?