Operational
Fully operational facility
Operated by:

Amazon: IAD-285

Short Code: IAD 285
Year Built: 2025
Utility Provider: Dominion Energy
Ownership: Amazon AWS leased from stack infrastructure (master building: stack: nva04a, #4875) the building.
This site is leased from STACK INFRASTRUCTURE in the Stack: NVA04A building

IAD-285 is an Amazon Web Services data center in STACK Infrastructure's NVA04A building at 22275 Lockridge Road in Sterling, Virginia. Amazon leases the whole building from STACK.

Map and Nearby Locations

This Facility
Amazon AWS Sites
Nearby Facilities

MaxInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Plaza TwoInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Stack: NVA04A
NVA04A is a three-story, 371,211 sq ft data center on STACK Infrastructure's NVA04 campus at 22275 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-285.
NN milesInterested in this information?Contact us Stack: NVA04B
NVA04B is the second data center on STACK Infrastructure's NVA04 campus at 22285 Lockridge Road in Sterling, Virginia, leased to Amazon Web Services as IAD-286.
NN milesInterested in this information?Contact us Core TowerInterested in this information?Contact us
IAD-286 is an Amazon Web Services data center in STACK Infrastructure's NVA04B building at 22285 Lockridge Road in Sterling, Virginia.
NN milesInterested in this information?Contact us Stack: NVA04C
NVA04C is the planned third data center on STACK Infrastructure's NVA04 campus at 22295 Lockridge Road in Sterling, Virginia.
NN milesInterested in this information?Contact us Core RidgeInterested in this information?Contact us
IAD-299 is a planned Amazon Web Services data center in STACK Infrastructure's NVA04C building at 22295 Lockridge Road in Sterling, Virginia.
NN milesInterested in this information?Contact us SDC: Low Latency Lane 1
SDC Building 1 (code name Tarpon) is a four-story, 561,538 sq ft data center under construction at 44595 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
NN milesInterested in this information?Contact us SDC: Low Latency Lane 2
SDC Building 2 (code name Tuna) is a four-story, 581,354 sq ft data center under construction at 44525 Low Latency Lane in Sterling, Virginia, on SDC Capital Partners' Low Latency Lane land condominium.
NN milesInterested in this information?Contact us SDC: Low Latency Lane Expansion
Undeveloped land on SDC Capital Partners' Low Latency Lane land condominium in Sterling, Virginia, held for a future data center.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

0
Facilities
0
Markets

News See all

Read AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus
Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land D...

AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus

October 07, 2026 Amazon AWS

Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land Development Plan with the Indiana County planning commission on August 28 under the project name...

Read more
Read AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania
Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussin...

AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania

October 07, 2026 Amazon AWS

Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussing potential development with Homer City Redevelopment. The proposed campus will span 1,100 acres...

Read more
Read AWS Receives Planning Approval for Data Center in Iver, UK
Amazon Web Services (AWS) has received planning approval for a new data center project in Iver, Buckinghamshire, UK. Buckinghamshire Council approved the development, which will replace 17 industri...

AWS Receives Planning Approval for Data Center in Iver, UK

October 01, 2026 Amazon AWS

Amazon Web Services (AWS) has received planning approval for a new data center project in Iver, Buckinghamshire, UK. Buckinghamshire Council approved the development, which will replace 17 industrial and warehouse units with a data center featuring 27 backup generators. Planning officers...

Read more
Read Generac Secures $8bn Backup Generator Deal With Amazon
Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. ...

Generac Secures $8bn Backup Generator Deal With Amazon

September 26, 2026 Amazon AWS

Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. Amazon will also have the option to buy nearly 1.7 million Generac shares. “It provides visibility...

Read more
Read Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio
Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joi...

Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio

September 21, 2026 Amazon AWS

Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joint venture between Rio Tinto and Alcoa. Its smelting process uses proprietary inert anodes instead...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?