Global RidgeInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Boardman, OR 97818, USA
Operational
Fully operational facility
Operated by:

Amazon: 75030 Gar Swanson

Short Code: Building 1
Year Built: 2025

Sites on this Campus:

  • Hyperscale Data CenterInterested in this information?Contact us
  • Hyperscale Data CenterInterested in this information?Contact us
  • Hyperscale Data CenterInterested in this information?Contact us
  • Hyperscale Data CenterInterested in this information?Contact us
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Map and Nearby Locations

This Facility
Amazon AWS Sites
Nearby Facilities

Edge ParkInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CentralInterested in this information?Contact us

Distance Site About
0.06 miles Hyperscale Data CenterInterested in this information?Contact us
0.08 miles Hyperscale Data CenterInterested in this information?Contact us
0.15 miles Hyperscale Data CenterInterested in this information?Contact us
0.24 miles Hyperscale Data CenterInterested in this information?Contact us
0.44 miles Tower BetaInterested in this information?Contact us
0.53 miles Cloud CenterInterested in this information?Contact us
0.53 miles North PlazaInterested in this information?Contact us
0.64 miles UltraInterested in this information?Contact us
0.68 miles GammaInterested in this information?Contact us
0.74 miles CentralInterested in this information?Contact us
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
0.77 miles StationInterested in this information?Contact us
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
0.77 miles ProInterested in this information?Contact us
0.78 miles East CenterInterested in this information?Contact us
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
0.84 miles Metro TowerInterested in this information?Contact us
0.87 miles Core HubInterested in this information?Contact us
1.70 miles South PointInterested in this information?Contact us
1.82 miles Plaza BetaInterested in this information?Contact us
1.87 miles Metro ValleyInterested in this information?Contact us
1.96 miles Global StationInterested in this information?Contact us
Construction started in 2012.
2.27 miles PlusInterested in this information?Contact us
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
2.35 miles West RidgeInterested in this information?Contact us
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
2.36 miles MetroInterested in this information?Contact us
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
2.43 miles West RidgeInterested in this information?Contact us
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
3.45 miles North ParkInterested in this information?Contact us
3.55 miles BetaInterested in this information?Contact us
3.71 miles Valley ThreeInterested in this information?Contact us
3.77 miles ParkInterested in this information?Contact us
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
9.11 miles Hyperscale Data CenterInterested in this information?Contact us
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
9.18 miles Hyperscale Data CenterInterested in this information?Contact us
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
9.26 miles Hyperscale Data CenterInterested in this information?Contact us
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
9.34 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon is developing a new campus for Morrow County, Oregon, located just southwest of the Tri-Cities.
11.86 miles Hyperscale Data CenterInterested in this information?Contact us
11.95 miles Hyperscale Data CenterInterested in this information?Contact us
12.06 miles Hyperscale Data CenterInterested in this information?Contact us
12.16 miles Hyperscale Data CenterInterested in this information?Contact us
12.70 miles Park PlusInterested in this information?Contact us
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
12.75 miles Core ParkInterested in this information?Contact us
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
12.87 miles North CampusInterested in this information?Contact us
Amazon’s development in Morrow County, Oregon, encompasses a 1,300-acre site designated for large-scale digital infrastructure.
12.93 miles Edge RidgeInterested in this information?Contact us
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
13.00 miles MaxInterested in this information?Contact us
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
13.52 miles Center UltraInterested in this information?Contact us
13.55 miles Station ThreeInterested in this information?Contact us
13.62 miles HubInterested in this information?Contact us
13.63 miles Ridge GammaInterested in this information?Contact us
13.94 miles Rowan Percheron
Rowan plans to develop a 1.125 million sq ft (104,515 sqm) data center complex totaling four buildings. Construction is slated to begin in 2024
14.80 miles GlobalInterested in this information?Contact us
14.82 miles Metro PlazaInterested in this information?Contact us
14.84 miles West PointInterested in this information?Contact us
14.87 miles ProInterested in this information?Contact us
16.68 miles Hyperscale Data CenterInterested in this information?Contact us
16.73 miles Hyperscale Data CenterInterested in this information?Contact us
16.78 miles Hyperscale Data CenterInterested in this information?Contact us
16.80 miles Hyperscale Data CenterInterested in this information?Contact us
17.13 miles CampusInterested in this information?Contact us
17.14 miles Plaza UltraInterested in this information?Contact us
17.16 miles North RidgeInterested in this information?Contact us
17.17 miles Point GammaInterested in this information?Contact us
17.47 miles East CenterInterested in this information?Contact us
17.47 miles Metro RidgeInterested in this information?Contact us
17.53 miles Core StationInterested in this information?Contact us
17.53 miles Edge PlazaInterested in this information?Contact us
17.59 miles CentralInterested in this information?Contact us
The site started construction in 2012.
17.71 miles CloudInterested in this information?Contact us
18.10 miles Sabey: SDC Umatilla
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
19.26 miles Central ParkInterested in this information?Contact us
19.34 miles West PointInterested in this information?Contact us
19.40 miles South StationInterested in this information?Contact us
19.49 miles Campus AlphaInterested in this information?Contact us

CampusInterested in this information?Contact us Data Center Photos See all

Large Content Company Data Centers in Rural Oregon
Source: Dan Aguayo - The Oregonian

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

583
Facilities
65
Markets

News See all

Read AWS Plans 800,000 sq ft Data Center Campus at GWU Site in Ashburn
Details have emerged about Amazon's latest planned data center campus in Northern Virginia. Loudoun County Supervisor Juli E. Briskman (D-Algonkian) said this week that Amazon has filed plans to de...

AWS Plans 800,000 sq ft Data Center Campus at GWU Site in Ashburn

July 31, 2026 Amazon AWS

Details have emerged about Amazon's latest planned data center campus in Northern Virginia. Loudoun County Supervisor Juli E. Briskman (D-Algonkian) said this week that Amazon has filed plans to develop a four-building, 800,000 sq ft (74,320 sqm) data center campus at the former George Washington...

Read more
Read AWS Proposes $1.2 Billion Data Center Campus Outside Housto
Amazon Web Services (AWS) is planning a new data center campus in Boling, Texas, outside Houston. Filed under Amazon Data Services with the Texas Department of Licensing and Regulation, “Project Ea...

AWS Proposes $1.2 Billion Data Center Campus Outside Housto

July 08, 2026 Amazon AWS

Amazon Web Services (AWS) is planning a new data center campus in Boling, Texas, outside Houston. Filed under Amazon Data Services with the Texas Department of Licensing and Regulation, “Project Eagle” will include four buildings on a roughly 2,700-acre site in Wharton County near FM 1301 and FM...

Read more
Read Amazon Expands Mumbai Data Center Land Lease by four Acres
Amazon has leased an additional four acres of land at its site in Powai, Mumbai, expanding its data center footprint in India. According to *The Economic Times*, the land has been leased from Larse...

Amazon Expands Mumbai Data Center Land Lease by four Acres

July 06, 2026 Amazon AWS

Amazon has leased an additional four acres of land at its site in Powai, Mumbai, expanding its data center footprint in India. According to The Economic Times, the land has been leased from Larsen & Toubro Ltd under a 17-year agreement through Amazon Data Services, the company's primary data...

Read more
Read AWS reports record expansion in 2025, adding 1.2GW of data centre capacity in Q4 alone
Amazon Web Services (AWS) highlighted strong expansion in its latest sustainability report, saying it added more data centre capacity globally than any other company last year, including over 1.2GW...

AWS reports record expansion in 2025, adding 1.2GW of data centre capacity in Q4 alone

July 02, 2026 Amazon AWS

Amazon Web Services (AWS) highlighted strong expansion in its latest sustainability report, saying it added more data centre capacity globally than any other company last year, including over 1.2GW in Q4 alone. Between October 2024 and October 2025, AWS added a total of 3.8GW. CEO Andy Jassy said...

Read more
Read Amazon Employees Back Data Center Regulations, Allege Workplace Retaliation
Three Amazon employees have alleged that the company retaliated against them after they testified in support of a Seattle data center moratorium. According to reports, the employees—Darius Irani, P...

Amazon Employees Back Data Center Regulations, Allege Workplace Retaliation

June 22, 2026 Amazon AWS

Three Amazon employees have alleged that the company retaliated against them after they testified in support of a Seattle data center moratorium. According to reports, the employees—Darius Irani, Patrick Schloesser, and Liesl Wigand, all members of Amazon Employees for Climate Justice (AECJ)—were...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?