Agder Data Center Market

Latest Podcast
Agder, at Norway's southern tip, is home to Bulk's N01 campus near Kristiansand, where GPU clouds run AI clusters. Grid hubs, subsea fibre and hydropower draw developers. New campuses at Arendal and Tonstad depend on rezoning and grid capacity. Read More

Market Facts

Agder Data Center Map

Agder Power Growth Over Time

+1350% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Agder

Bulk Infrastructure AS
Site
Power
Operational
3
58.0
Construction
1
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
4
View Provider
CoreWeave
Site
Power
Operational
1
42.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Northern Data AG
Site
Power
Operational
1
6.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
GreenScale Data Centres
Site
Power
Operational
0
0.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
4
Withdrawn
0
Decommissioned
0
Totals
0
View Provider

Largest Data Centers in Agder

Location About Total SqFt Power (MW)
BULK: N01 DCM102
Bulk Data Centers DCM102 facility is located at the N01 Data Center Campus in Kristiansand, south...
NN Request Dataset NN Request Dataset
CoreWeave: Kristiansand N01
CoreWeave runs an Nvidia GB200 NVL72 cluster in Bulk Data Centers' DCM102 building on the N01 cam...
NN Request Dataset
BULK: N01 DCM101
DCM101 is the second data center building on Bulk Data Centers' N01 campus at Vennesla, near Kris...
NN Request Dataset NN Request Dataset
Ardent: Kristiansand
Taiga Cloud, Northern Data's GPU cloud, runs Nvidia H100 clusters in Bulk Data Centers' N01 campu...
NN Request Dataset
Bulk Kristiansand N01 Campus
The campus is located at the southmost part of Norway in close proximity and with dark fiber rout...
NN Request Dataset

About This Metro

Overview

Agder is the southernmost region of Norway. Its market centres on the N01 campus at Vennesla, north of Kristiansand, beside major grid and subsea links to Denmark. GPU clouds take most of the space there. Two new campuses are planned, at Arendal and at Tonstad in Sirdal.

History

Statnett connected Bulk Infrastructure's N01 campus at the end of 2019, and its first data centre followed. Bulk's branch of the Havfrue subsea cable, which links N01 to the US, entered service at the end of 2020. Bulk opened a second building in 2023 and a third in 2025. Northern Data's Taiga Cloud installed Nvidia H100 clusters on the campus, and CoreWeave runs an Nvidia GB200 cluster in the third building. GreenScale bought the Tonstad DataPark company in September 2025.

The Market Today

N01 has about 300 hectares zoned for data centres, and Bulk runs its own grid company there, N01 Utilities. DE-CIX runs its Kristiansand exchange on the campus. A fourth building is due in 2027.

Bulk has agreed to buy a plot at Longum Nord in Eyde Material Park, Arendal, for a second campus. It plans to take over the land in autumn 2027, after rezoning and a grid connection. GreenScale planned a four-building campus beside Statnett's Ertsmyra station at Tonstad. In November 2026 the county governor overturned its zoning, so the project needs a new plan. Tryland Data Center plans to convert industrial buildings at Lindesnes.

Advantages

  • Grid hubs. N01 sits beside Statnett's Kristiansand station and the converter for the Skagerrak cables to Denmark. The Ertsmyra station at Tonstad anchors the NordLink cable to Germany.
  • Hydropower. Sira-Kvina's Tonstad power station, Norway's largest by annual output, sits in Sirdal.
  • Connectivity. The Havfrue cable and dark fibre routes link Kristiansand to continental Europe, the UK and the US.
  • Zoned land. N01 and Eyde Material Park offer large plots for industry.

Challenges

  • Grid access. Statnett's November 2026 pause on new data-centre reservations applies here too. The Arendal takeover waits on a grid decision.
  • Zoning. The Tonstad ruling showed that a county governor can overturn a municipal zoning decision and require a full impact assessment.
  • Power prices. Agder lies in NO2, the southern bidding zone. Its cables to Denmark, the Netherlands and Germany tie its prices closely to continental Europe.

Trends

  • GPU clouds anchor the market. CoreWeave and Taiga Cloud run AI clusters at N01.
  • New zoning excludes crypto. The Arendal rezoning for Eyde Material Park bans crypto mining.

Power and Policy

Statnett runs the transmission grid. Glitre Nett distributes power across most of Agder, and N01 Utilities runs the grid inside the N01 campus. Agder lies in the NO2 bidding zone. The county governor of Agder (Statsforvalteren i Agder) hears appeals against municipal zoning.

Get Quotes

Related News See all

Read CoreWeave Tops 1.7GW Active Power As Backlog Reaches $132.5B
[CoreWeave](https://baxtel.com/data-centers/coreweave) added more than 200 MW of active power in the third quarter, lifting its live footprint past 1.7 GW. The neocloud [reported third-quarter resu...

CoreWeave Tops 1.7GW Active Power As Backlog Reaches $132.5B

November 12, 2026 CoreWeave

CoreWeave added more than 200 MW of active power in the third quarter, lifting its live footprint past 1.7 GW. The neocloud reported third-quarter results on Nov. 10 with revenue of $3.66 billion for the quarter ended Sept. 30, up 168 percent from a year earlier. The company said the gain doubled...

Read more
Read CoreWeave Brings 22.5MW Online at atNorth's Copenhagen Data Center
CoreWeave has brought most of its planned 22.5MW of IT capacity online at [atNorth](https://baxtel.com/data-centers/atnorth)'s [DEN01](https://baxtel.com/data-center/atnorth-den01) data center in t...

CoreWeave Brings 22.5MW Online at atNorth's Copenhagen Data Center

October 27, 2026 CoreWeave

CoreWeave has brought most of its planned 22.5MW of IT capacity online at atNorth's DEN01 data center in the Copenhagen metro, its first deployment in Denmark. The company announced the activation from London on October 27. atNorth owns and operates DEN01, a colocation site in Ballerup,...

Read more
Read CoreWeave Enters India With 240MW AdaniConneX Lease In Navi Mumbai
CoreWeave will lease 240MW of data center capacity in Navi Mumbai from AdaniConneX, marking the AI cloud provider's first deployment in India. The companies [announced the plan](https://www.corewea...

CoreWeave Enters India With 240MW AdaniConneX Lease In Navi Mumbai

October 08, 2026 CoreWeave

CoreWeave will lease 240MW of data center capacity in Navi Mumbai from AdaniConneX, marking the AI cloud provider's first deployment in India. The companies announced the plan on October 6, with the first phase due online in the middle of 2028. CoreWeave (Nasdaq: CRWV) takes the whole of...

Read more
Read CoreWeave To Develop 360MW Data Center Capacity In Indonesia
CoreWeave is expanding into Indonesia with plans to develop three data centers, marking its first entry into the Asia-Pacific region. Scheduled to launch in 2028, the facilities will provide a comb...

CoreWeave To Develop 360MW Data Center Capacity In Indonesia

August 04, 2026 CoreWeave

CoreWeave is expanding into Indonesia with plans to develop three data centers, marking its first entry into the Asia-Pacific region. Scheduled to launch in 2028, the facilities will provide a combined 360MW of IT capacity, with CoreWeave owning and operating the compute infrastructure while...

Read more
Read CoreWeave Anchors Phase 1 of eStruxture's 90 MW Calgary CAL-3
CoreWeave Anchors Phase 1 of eStruxture's 90 MW Calgary CAL-3

CoreWeave Anchors Phase 1 of eStruxture's 90 MW Calgary CAL-3

May 17, 2026 eStruxture: CAL-3

eStruxture has signed CoreWeave as the anchor tenant for Phase 1 of CAL-3, its 90 MW AI-ready data center in Rocky View County just outside Calgary, eStruxture announced on May 14. The Tier III facility is the largest data center under construction in Alberta and is targeted for commercial...

Read more
Read Poolside Pursues New Partners for Texas Data Center Following CoreWeave Deal Breakdown
Poolside Pursues New Partners for Texas Data Center Following CoreWeave Deal Breakdown

Poolside Pursues New Partners for Texas Data Center Following CoreWeave Deal Breakdown

April 04, 2026 CoreWeave

AI startup Poolside is in discussions with cloud providers, including Google, as it looks to secure a new partner for its Texas data center project. The talks follow the collapse of Poolside’s previous agreement with CoreWeave for the development.CoreWeave and Poolside reached an agreement in...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.