Equinix: RJ3

Latest Podcast R. Maria Soares Sendas - Parque Barreto
Operational
Fully operational facility
Operated by:

Equinix: RJ3

Year Built: 2025
░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

RJ3 Features


  • Colocation Space: 16,011 sq. ft. (1,487 sq. m.)
  • Building Type: Single-story precast structure
  • Cabinet Density: 6 kVA per cabinet
  • Power Distribution: 240V/415V
  • Utility Feeders: Dual redundant feeders from on-site HV substation (substation to be shared with future
    expansion) 2 from the same path, sharing HV towers
  • UPS Configuration: Block redundant
  • UPS Redundancy: N+1
  • Standby Power Configuration: 1x 3500kW LV generator dedicated to each power block; Total 4x 3500 kW LV generators with more than 30hrs of autonomy
  • Standby Power Redundancy: N+1

Map and Nearby Locations

R. Maria Soares Sendas - Parque Barreto
Equinix Sites
Nearby Facilities

Equinix: RJ3 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Equinix: RJ3

Distance Site About
0.16 miles CloudHQ: Rio GIG 1
CloudHQ’s GIG Campus, the company's second data center development in Brazil, is located in São João de Meriti, 18 km (11 miles) from the metropolitan region of Rio de Janeiro.
0.50 miles Scala: Rio de Janeiro SGIGSM01
SM01 is a modular hyperscale-focused site made by individualized MW modules. Each module can be built with specific topology.
0.59 miles ODATA RJ-01
1.04 miles Ascenty Rio de Janeiro
7.08 miles Equinix Rio RJ2
9.43 miles Ada: Rio de Janeiro
Ada Infrastructure's Rio de Janeiro campus will consist of 3 single-story turnkey high-density data center buildings.
11.21 miles Cirion Rio de Janeiro
11.75 miles Elea: RJO4
RJO4 will be part of Elea's extensive Rio AI City Campus in Rio de Janeiro.
11.84 miles Elea: RJO3
RJO3 will be part of Elea's extensive Rio AI City Campus in Rio de Janeiro.
11.99 miles Elea: RJO2
Part of Elea's extensive Rio AI City Campus, RJO2 is set to become operational in 2026.
12.07 miles Elea: Rio AI City RJO1
Elea, a Brazilian data center company, is developing a massive, gigawatt-scale campus in Rio de Janeiro. Once complete, the campus could feature around 27 buildings.
13.12 miles Carrier-Neutral Data CenterInterested in this information?Contact us
13.54 miles Tecto: Rio CLS
Tecto operates a 1,600 m² cable landing station in Rio de Janeiro, Brazil.
13.95 miles TowerInterested in this information?Contact us
14.05 miles Takoda: Rio de Janeiro RJ01
Takoda is a subsidiary of Tivit, a Brazilian-based IT services company. In 2023, Tivit spun off its data center business to create a new company named Takoda.
14.69 miles Equinix Rio RJ1

Equinix: RJ3 Data Center Photos See all

DC Ultranet Telecom located in São Paulo/SP near of downtown, with high capacity and security, connected with the major carriers in Brazil (Algar, Vivo, Embratel/Claro, Century Link, Cogent, Hurric...
DC Ultranet Telecom
Source: Baxtel

DC Ultranet Telecom located in São Paulo/SP near of downtown, with high capacity and security, connected with the major carriers in Brazil (Algar, Vivo, Embratel/Claro, Century Link, Cogent, Hurricane Electric and other carriers) direct connection with high capacity between all Equinix in Brazil and Nap of the Americas also we have connection with IX.Br and FL-Ix.

Equinix cage door
Source: Baxtel

Operating Company

Operated by:

Equinix connects the world’s leading businesses to their customers, employees and partners inside the most interconnected data centers.

318
Facilities
84
Markets
2093MW
Megawatts

News See all

Read Equinix to Reuse Data Center Heat to Warm Homes in Milan
Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, E...

Equinix to Reuse Data Center Heat to Warm Homes in Milan

July 10, 2026 Equinix

Equinix has partnered with Italian energy company A2A to recover waste heat from its data center campus in Settimo Milanese and feed it into Milan’s district heating network. Under the agreement, Equinix will design and operate the heat recovery system, while A2A will use four large-scale heat...

Read more
Read Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland
Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deploy...

Equinix Trials Hydrogen Fuel Cell Technology at Data Center in Ireland

June 19, 2026 Equinix

Equinix has launched its first trial of hydrogen fuel cell technology as a replacement for diesel backup generation at a data center in Ireland. Working with ESB and GeoPura, the company has deployed two hydrogen-powered generators at its DB3 Data Center facility. The 12-week trial will support...

Read more
Read Equinix is Building its Fourth Data Center in Malaysia
Equinix is Building its Fourth Data Center in Malaysia

Equinix is Building its Fourth Data Center in Malaysia

May 12, 2026 Equinix

Equinix will build its fourth data center in Malaysia, KL2, in Kuala Lumpur. The US$190 million facility will house over 2,200 cabinets at full build-out, though its size and IT capacity were not disclosed. Equinix said the new data center will be located less than 1 km from its KL1 facility in...

Read more
Read Equinix Begins Construction on DB7x Data Center in Dublin
Equinix Begins Construction on DB7x Data Center in Dublin

Equinix Begins Construction on DB7x Data Center in Dublin

March 30, 2026 Equinix

Equinix has begun construction on a new $92 million data center in Dublin, Ireland. The DB7x facility will be located in Blanchardstown, near the company’s existing sites in the city. Equinix is allocating $78 million toward high-performance infrastructure for AI workloads and $14 million for its...

Read more
Read EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape
EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

EuroCTP Selects Equinix's FR2 Data Center for Equity Trading Consildated Tape

January 29, 2026 Equinix

EuroCTP, a new provider of an EU real-time pre and post-trade Consolidated Tape (CT) for financial equity trades, has selected Equinix's FR2 data center to host its 'tape' in Frankfurt, Germany.“Equinix FR2 provides EuroCTP with the ideal foundation to drive growth, ensuring we can reliably meet...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?