Carrier-Neutral Data CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Olds, AB T4H 1T9, Canada
Planned
Future facility in planning stage
Operated by: Carrier-Neutral OperatorInterested in this information?Contact us

Carrier-Neutral Data Center

Site planned for 2027 and has expansions through 2029
Lot Size: 300 acres

Synapse Data Centre Inc. is advancing a $10-billion private-sector project in Olds, Alberta, aimed at establishing one of Canada’s most significant digital infrastructure hubs. Located on a 300-acre site, the proposed 2-million-square-foot campus is designed to support high-density AI workloads and cloud computing.

To ensure operational reliability without straining the provincial electrical grid, the facility will utilize on-site natural gas-fired power generation and a closed-loop water cooling system that requires only a one-time fill.

The project is expected to create 2,000 construction jobs and over 1,000 permanent high-tech roles, with a phased construction timeline targeting initial operations as early as late 2026 and full campus completion within two years.

Map and Nearby Locations

This Facility
Carrier-Neutral OperatorInterested in this information?Contact us Sites
Nearby Facilities

Carrier-Neutral Data CenterInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by: Carrier-Neutral OperatorInterested in this information?Contact us
This operator's profile is available on request. Full company details, market presence, portfolio scale, and operating history are available to subscribers with unblurred access. Contact us to unlock the complete operator profile for this facility and every other location in their footprint.Interested in this information?Contact us
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?