Data Center Campus
Vantage’s 68-acre campus spans three data centers totaling nearly 775,000 square feet, anchored by the 530,000-square-foot WA13 facility completed in 2023. Tenants benefit from some of the lowest Total Cost of Ownership (TCO) in the nation, driven by low-cost local hydropower and Washington state tax incentives.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Vantage WA11 | Vantage Data Centers |
Operational
|
░░░ Request Dataset MW | 168,000 SqFt | 2013 |
| Vantage WA12 | Vantage Data Centers |
Operational
|
░░░░ Request Dataset MW | 128,000 SqFt | 2020 |
| Vantage WA13 | Vantage Data Centers |
Operational
|
░░░░ Request Dataset MW | 530,000 SqFt | 2023 |