Data Center Campus

SB Energy: Stargate Milam Campus

SB Energy's data center campus in Milam County, Texas, beside its Orion solar plants. An OpenAI affiliate leases both buildings. Construction began in 2025, with service expected from 2027 through 2028.

2 sites Austin
Under Construction
New facility under construction
Developed by:

Campus at a Glance

2 data centers on this campus
First built in 2027 with expansions through 2028
Coordinates: 30.99775, -97.01127
░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

SB Energy, a SoftBank Group company, is developing the campus on a 606-acre site near Burlington, Texas, beside its Orion Solar Belt. OpenAI named Milam County one of its Stargate sites in September 2025. An OpenAI affiliate leases both buildings under 15-year triple-net leases signed in January 2026.

SB Energy owns the land, the buildings and the power infrastructure, and runs the facility. OpenAI designed the buildings and supplies its own computing equipment.

Power

SB Energy's Orion I, II and III solar plants supply the campus behind the meter through a private use network. Oncor provides transmission and distribution in ERCOT, plus auxiliary service to the campus.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
SB Energy: Milam County 1 SB Energy
Under Construction
— — 2027
SB Energy: Milam County 2 SB Energy
Under Construction
— — 2028

Map and Nearby Locations

SB Energy: Stargate Milam Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

SB Energy is enabling the new AI economy, by developing, building, and owning its critical physical infrastructure.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?