Data Center Campus

Rowan: Frederick 2 Campus

4 sites Maryland
Under Construction
New facility under construction
Operated by:

Campus at a Glance

4 data centers on this campus
First built in 2026
Coordinates: 39.32405, -77.46455
░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

In December 2024, Rowan Digital Infrastructure received approval for two data center projects in Frederick County, Maryland. Located at Quantum Loophole's site, Bauxite II and Bauxite III will join the company's first Bauxite data center, with both situated adjacent to Bauxite I. Bauxite II will span 822,620 sq ft (76,400 sqm) on a 111.5-acre site, comprising four data center buildings.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Rowan: Frederick 2A Rowan Digital Infrastructure
Under Construction
— — 2026
Rowan: Frederick 2B Rowan Digital Infrastructure
Under Construction
— — 2026
Rowan: Frederick 2C Rowan Digital Infrastructure
Under Construction
— — 2026
Rowan: Frederick 2D Rowan Digital Infrastructure
Under Construction
— — 2026

Map and Nearby Locations

Rowan: Frederick 2 Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Rowan Digital Infrastructure is a US data center developer that designs and delivers hyperscale campuses for large cloud and AI customers. The company is part of Quinbrook Infrastructure Partners and began in 2020 as a joint venture with Birch Infrastructure, and has been referred to as Rowan Green Data.

Its current US pipeline includes three campuses at the Quantum Frederick park in Maryland, the Cinco campus near San Antonio, Texas, a site in Temple, Texas, and the Percheron campus in Oregon. Verified capacity figures include a 300 MW Percheron plan in Morrow County, Oregon, and a 300 MW Cinco campus in Medina County, Texas.

Rowan Digital Infrastructure History:

  • In August 2025, broke ground on the 300 MW Cinco hyperscale campus outside San Antonio, Texas.
  • In February 2025, closed approximately $1.24 billion in construction financing for the second phase of its Maryland campus at TPG’s Quantum Frederick site.
  • Founded as Rowan Green Data in 2020 via a joint venture between Quinbrook Infrastructure Partners and Birch Infrastructure.
0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?