Data Center Campus

Nabiax: Alcalá de Henares Campus

3 sites Madrid
OperationalUnder ConstructionPlanned
Operational facility with ongoing expansion and future phases planned
Operated by:

Campus at a Glance

3 data centers on this campus
First built in 2012 with expansions through 2029
Total building size: 265,870 SqFt
Coordinates: 40.51952, -3.34121
░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.

Telefónica's data center opened late in 2012. and Built out in five phases, with a total of 23 server IT rooms. The first phase entails the design and construction of a 24,700 square meter building containing seven server rooms each measuring 680 square meters. The project was built to meet the Uptime Institute's Tier IV standard.

The server rooms are cooled using Free Cooling technology, which uses external ambient air when the temperature is lower than inside the room; this greatly reduces power consumption and will enable the center to attain a PUE of 1.3.

ADC1 Features


  • Start of operations: 2013
  • IT Rooms: 7
  • Surface: 4.800 m2
  • Generators’ topology: 2N
  • Cooling systems: Chiller 2N / AHUs N+2
  • Fiber entries: 3

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Nabiax: ADC 1 Nabiax
Operational
░░░ Request Dataset MW 265,870 SqFt 2012
Nabiax: ADC 2 Nabiax — — 2021
Nabiax: ADC 3 Nabiax
Under ConstructionPlanned
— — 2027

Map and Nearby Locations

Nabiax: Alcalá de Henares Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Nabiax, a data center provider, was created in 2019 when Asterion Industrial Partners acquired certain Telefonica data centres in Spain and Latin America.

In 2021, it bought two more Telefonica facilities on the Julián Camarillo campus

0
Facilities
0
Markets
0MW
Megawatts

News

Read Nabiax increases the capacity of the Alcala data facility in Spain to 22MW
Nabiax increases the capacity of the Alcala data facility in Spain to 22MW

Nabiax increases the capacity of the Alcala data facility in Spain to 22MW

June 09, 2023 Nabiax: ADC 1

The data center operator Nabiax has begun expanding its Alcala Data Center in Spain. The company plans to increase the facility's capacity by 47% by the end of the year, from 15.1MW to 22MW. The center is located northeast of Madrid in Alcalá de Henares. After the expansion process, the company...

Read more
Read More News

Documents

Ready to Level up Your
Data Center Strategy?