Meta's data center campus in the Tietgenbyen business park in Odense, Denmark, whose server heat warms homes through Fjernvarme Fyn's district heating network. Meta cancelled two further buildings in 2022. First built in 2019, with expansions through 2023.

5 sites Denmark
OperationalWithdrawn
Fully operational facility with some phases cancelled
Developed by:

Campus at a Glance

5 data centers on this campus
First built in 2019
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 55.36765, 10.48363
░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

Meta's Odense campus sits in the Tietgenbyen business park in Odense SØ, on Funen, about 7 km east-southeast of central Odense. Cassin Networks ApS, a Meta subsidiary, holds the land and runs the campus. The main gate is on M.P. Allerups Vej.

Land. The original plot covers about 50 ha. In 2021 Odense Kommune adopted Lokalplan 4-1022 so Meta could add about 39 ha of adjoining land for two more data halls. Meta ended that project in December 2022.

Power. Energinet built a 150 kV switching station on the campus. It links to Energinet's Fraugde station and takes supply from both the eastern and western Danish grids. Meta owns the adjoining 150/20 kV transformer station, which has three transformers. Forty Caterpillar 3.2 MW diesel generators provide backup power.

Heat recovery. Meta designed the campus around heat recovery. Fjernvarme Fyn owns an ammonia heat-pump plant about 600 m away that lifts server heat to district-heating temperature. Meta supplies the heat free of charge: 165,000 MWh a year, enough for about 9,000 homes. Ramboll engineered the plant.

Renewables. Meta matches the campus load with wind power from two Norwegian wind farms (294 MW, Bjerkreim cluster) and 211 MW from three new solar projects in Denmark.

Milestones. Facebook confirmed the project in January 2017 and broke ground that year. The first buildings earned LEED Gold in 2020. In October 2020 Meta started a third building of nearly 30,000 m². In August 2022 Meta signed a DKK 2.4 billion civil-works contract with Per Aarsleff for two more buildings. It terminated the contract in December 2022, saying AI workloads need a different data center design. Earthworks, foundations, cable trenches and a 1,000-car car park were already in place. Meta puts its Odense investment at more than DKK 10 billion. The campus won the 2021 Green Data Centre of the Year award.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
South RidgeInterested in this information?Contact us Meta
Operational
░░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2019
South ParkInterested in this information?Contact us Meta
Operational
░░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2019
ParkInterested in this information?Contact us Meta
Operational
░░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2023
Prime CampusInterested in this information?Contact us Meta
Withdrawn
— — 2024
RidgeInterested in this information?Contact us Meta
Withdrawn
— — 2025

Map and Nearby Locations

Meta: Odense Campus Power Growth Over Time

+50% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

0
Facilities
0
Markets

News

Read Meta/Facebook is expanding its Odense data center campus in Denmark
Meta/Facebook is expanding its Odense data center campus in Denmark

Meta/Facebook is expanding its Odense data center campus in Denmark

December 13, 2021 Hyperscale Data Center

Meta, formerly known as Facebook, plans to expand its Odense data center campus in Denmark. Meta says it will be adding two buildings with a total space of 969,000 square feet (90,000 square meters). The addition will bring the total floor space at the facility to up to 2.1 million square meters...

Read more
Read More News

Documents

Ready to Level up Your
Data Center Strategy?