Meta's El Paso campus is a hyperscale data center campus under construction on about 1,039 acres in northeast El Paso, Texas, with buildings coming online from 2027 through 2029.

11 sites El Paso
Under ConstructionPlanned
Multi-phase construction project
Developed by:

Campus at a Glance

11 data centers on this campus
First built in 2027 with expansions through 2029
Coordinates: 31.99203, -106.35827
░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Meta is building the campus on former city land off Stan Roberts Sr. Avenue in northeast El Paso, near the Texas-New Mexico state line. The plan calls for 10 data center buildings and a network building, plus administration and warehouse buildings and five on-site substations. Meta designed the buildings for AI workloads with closed-loop liquid cooling. El Paso Water caps the campus's water use at 2.5 million gallons a day.

El Paso Electric serves the first phase from its existing system and is building new 345 kV substations and transmission lines for the rest. Until those lines are in service, the utility plans a 366 MW natural-gas plant beside the campus, built and run by Enchanted Rock. Meta pays the plant's cost during that bridge period, and Texas regulators were still reviewing the plant in November 2026.

In July 2026 Meta formed a joint venture with funds managed by BlackRock's Global Infrastructure Partners and HPS to own the campus. Meta keeps a 20% stake and leases the buildings, and the venture sold more than $12 billion of notes to fund construction.

Campus History

  • July 2026: Meta and BlackRock-managed funds form the joint venture that owns the campus.
  • March 2026: Meta raises its planned investment in the campus to more than $10 billion, up from an early estimate of $1.5 billion.
  • October 2025: Meta breaks ground.
  • December 2023: El Paso City Council approves the sale of about 1,039 acres of city land to Wurldwide LLC, Meta's development entity, and an incentive agreement.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
SouthInterested in this information?Contact us Meta
Under Construction
— — 2027
Tower OneInterested in this information?Contact us Meta
Under Construction
— — 2027
ParkInterested in this information?Contact us Meta
Under Construction
— — 2027
West CenterInterested in this information?Contact us Meta
Under Construction
— — 2027
MetroInterested in this information?Contact us Meta
Under Construction
— — 2027
Edge ValleyInterested in this information?Contact us Meta
Under Construction
— — 2028
TwoInterested in this information?Contact us Meta
Under Construction
— — 2028
PrimeInterested in this information?Contact us Meta
Planned
— — 2028
Global StationInterested in this information?Contact us Meta
Planned
— — 2028
Station BetaInterested in this information?Contact us Meta
Planned
— — 2029
Ridge AlphaInterested in this information?Contact us Meta
Planned
— — 2029

Map and Nearby Locations

Meta: El Paso Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

0
Facilities
0
Markets
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.