Data Center Campus

Meta: Clonee Campus

Meta's Clonee campus covers about 133 hectares on both sides of Portan Road in Clonee, County Meath, on the Dublin 15 border, with five single-storey data center buildings and two on-site 220 kV substations. First built in 2017, with expansions through 2023.

5 sites Dublin
Operational
Fully operational facility
Developed by:

Campus at a Glance

5 data centers on this campus
First built in 2017
Total building size: ░░░░░░░░░ Request Dataset SqFt
Coordinates: 53.41857, -6.43711
░░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

Meta's Clonee data center campus sits on about 133 hectares of former farmland in the townlands of Gunnocks, Portan, Loughsallagh and Clonee, County Meath. It lies on the county boundary with Fingal, about 6 km northwest of the M50. Portan Road (L5028) splits the campus into an eastern section, permitted in 2015, and a western section, permitted in 2018. Damastown Industrial Park lies to the east and Clonee village to the south.

Ownership. Meta's Irish subsidiary Runways Information Services Limited owns and operates the campus. Meath County Council granted permission in July 2015 (RA/150605), and An Bord Pleanala upheld it on appeal in October 2015 (PL17.245347). Facebook broke ground in April 2016. The council permitted the two-building western expansion in 2018 (RA/180671). Meta announced that expansion in March 2019 and paused construction for COVID-19 in March 2020. Meta puts its total investment at EUR 1.4 billion.

Power. Two on-site 220 kV air-insulated substations connect the campus to the national grid. ESB Networks owns them and EirGrid operates them. Clonee 220 kV station loops into the Corduff-Woodland No. 1 220 kV line. It was the first 220 kV station in Ireland built by a customer. Bracetown 220 kV station serves the western buildings through two 2.5 km underground 220 kV cables from Clonee station. Each substation has a Meta-owned transformer compound feeding 20 kV distribution. Backup power comes from 90 containerised diesel generators, 18 per building, each rated 8.26 MWth. The 36 western generators carry SCR NOx abatement. Clonee was the first Meta site to switch its generators to HVO. The EPA regulates them under Industrial Emissions Licence P1192-01.

Sustainability. Meta supports three new Irish wind and solar projects totalling 219 MW, including two Vantage RE solar farms in Meath and Wexford. The western buildings use StatePoint Liquid Cooling. The operational buildings hold LEED Gold certification.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Hub UltraInterested in this information?Contact us Meta
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2017
Park MaxInterested in this information?Contact us Meta
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2018
Plaza GammaInterested in this information?Contact us Meta
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2019
South PointInterested in this information?Contact us Meta
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2022
MaxInterested in this information?Contact us Meta
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2023

Map and Nearby Locations

Meta: Clonee Campus Power Growth Over Time

+27% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

0
Facilities
0
Markets

News

Read Facebook Suspends Construction at Clonee, Ireland Data Center
Facebook Suspends Construction at Clonee, Ireland Data Center

Facebook Suspends Construction at Clonee, Ireland Data Center

March 25, 2020 Hyperscale Data Center

Facebook is suspending construction at it's Clonee data center in Ireland due to concerns over the Covid-19 virus. Facebook's contractor, Mace, agreed to temporarily halt work at the site. Facebook had planned to double the size of the facility with two new buildings announced last year.Read more...

Read more
Read Facebook plans two more data centers in Dublin
Two years after breaking ground on its first Irish data center, Facebook is planning another two facilities on the same campus in Clonee, Meath County, 10 miles (17km) north of Dublin, according to...

Facebook plans two more data centers in Dublin

June 30, 2018 Hyperscale Data Center

Two years after breaking ground on its first Irish data center, Facebook is planning another two facilities on the same campus in Clonee, Meath County, 10 miles (17km) north of Dublin, according to the Irish Times. The data centers, representing an investment nearing €300 million ($349m), will be...

Read more