Data Center Campus

Google: Fort Wayne Campus (Project Zodiac)

9 sites Indiana
OperationalUnder ConstructionPlanned
Operational facility with ongoing expansion and future phases planned
Developed by:

Campus at a Glance

9 data centers on this campus
First built in 2025 with expansions through 2030
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 41.0309, -85.04231
░░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

The multi-billion dollar Google data center campus in Fort Wayne, known as Project Zodiac, is an expansive economic development project currently under construction and partially operational as of late 2025, with an initial investment of at least $2 billion committed to power its Google Cloud and AI infrastructure. The project was originally announced in late 2023 and officially confirmed by Google in early 2024.

However, the project recently entered a controversial Phase 2 expansion when the developers requested and received permission from the Indiana Department of Environmental Management (IDEM) to fill in nearly two-and-a-half acres of regulated wetlands to make way for five additional data center buildings and associated infrastructure. This decision was met with significant local opposition, including environmental groups and residents concerned about the loss of the wetlands' critical functions like flood control and water quality, as well as the overall strain the massive facility places on local water and power resources. Despite public requests for a hearing, IDEM issued the permit in September 2025, requiring Google to mitigate the loss by purchasing wetland credits in a different part of Allen County, underscoring the ongoing tension between large-scale tech development and environmental preservation.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
ThreeInterested in this information?Contact us Google
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2025
Metro TowerInterested in this information?Contact us Google
Under Construction
— — 2026
UltraInterested in this information?Contact us Google
Under Construction
— — 2027
Hub AlphaInterested in this information?Contact us Google
Under Construction
— — 2027
ParkInterested in this information?Contact us Google
Under Construction
— — 2028
Park UltraInterested in this information?Contact us Google
Planned
— — 2028
Park PlusInterested in this information?Contact us Google
Planned
— — 2029
Metro ParkInterested in this information?Contact us Google
Planned
— — 2029
ProInterested in this information?Contact us Google
Planned
— — 2030

Map and Nearby Locations

Google: Fort Wayne Campus (Project Zodiac) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.