Data Center Campus

DC Blox: Thunderbird Indianapolis Campus

2 sites Indianapolis
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Campus at a Glance

2 data centers on this campus
First built in 2028 with expansions through 2031
Coordinates: 39.76662, -86.05022
░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

In response to heavy community pushback, DC Blox scaled back its plans for an Indianapolis east side data center to a two-building layout totaling 320,000 square feet, eliminating 25 proposed diesel generators and expanding the buffer zone south of the Pennsy Trail.

The developer originally proposed a $2 billion, 420,000-square-foot campus featuring three buildings and up to 56 backup diesel generators. The revised project will now be built in two phases—starting with a single-story 70,000-square-foot building expected within two years, followed by a two-story 250,000-square-foot building targeted for completion in roughly five years.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
DC Blox: Thunderbird 1 DC BLOX
Under Construction
— — 2028
DC Blox: Thunderbird 2 DC BLOX
Planned
— — 2031

Map and Nearby Locations

DC Blox: Thunderbird Indianapolis Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

DC BLOX is a digital infrastructure provider in the Southeastern United States. The company provides colocation, network connectivity and dark fiber services for enterprises and carriers, and operates a cable landing station in South Carolina with a second station planned in Florida.

It is developing hyperscale data center campuses in the Atlanta metro area. In 2025 the company announced additional subsea capacity and secured project financing to advance Atlanta West.

History:

  • 2025-08: Secured a $1.15 billion green loan to develop the Atlanta West data center campus in Douglas County, Georgia.
  • 2025-07: Announced a second subsea cable landing station campus in Palm Coast, Florida, expected to be operational by Q1 2027.
  • 2022-05: Acquired Southeastern fiber assets from Light Source Communications and Ascendant Capital Fiber.
0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?