Published in Africa

Shapoorji Pallonji signs MoU to build data center in Gabon

Jul 07, 2023 | Posted by MadalineDunn

Shapoorji Pallonji has announced that it has signed a Memorandum of Understanding (MoU) with the Gabonese state for a national data center project.

Reports note that the project has been underway for a number of months, with the company first visiting Gabon in March 2023. 

While further details about the facility have not been shared, the project is set to go ahead following the Minister of Digital Economy Jean Pierre Doukaga Kassa and the Minister of Tourism Jean-Norbert Diramba signing the MoU with Shapoorji Pallonji CEO Ransit Gajav.

The facility will be used for the managing and storage of governmental data. 

There are 110 data centers in Africa.

Digital Parks Africa is expanding its campus in South Africa
Posted in Digital Parks Africa: Samrand Source: Digital Parks Africa
Teracos' JB4 data center in Johannesburg, South Africa
Posted in Teraco JB4 Source: Teraco
Rendering of iXAfrica's Nairobi Campus
Posted in iXAfrica: Nairobi NBOX1 Source: iXAfrica
Rendering of Vantage's Johannesbug I Campus
Posted in Vantage: JNB12 Source: Vantage Data Centers
Outside of LOS1
Posted in OADC: Lagos LOS1 |
Aerial view of ACPT1
Posted in ADC Cape Town CPT1 Source: ITWeb Africa
Rendering of Congo facility
Posted in Raxio Kinshasa |
Rendering of new Teraco facility
Posted in Teraco JB5 |
Birdseye view of the NTT's first data center in South Africa
Posted in NTT Johannesburg 1 |
Exterior of LOS1
Posted in ADC Lagos LOS1 |
Vantage's 1st building in Johannesburg under construction in 2021
Posted in Vantage Johannesburg |
Rendering
Posted in Vantage Johannesburg |
Teraco's CT2 data centre, in Cape Town
Posted in Teraco Cape Town CT2 |
Outside the fence
Posted in Teraco Cape Town CT2 Source: Teraco
CT2 – Brackenfell
Posted in Teraco Cape Town CT2 Source: Teraco
There are 3 buildings on campus
* JB1 East
* JB1 West 
* JB3
The Teraco Johannesburg Campus Layout (J1, J3)
Posted in Teraco Johannesburg JB1 |
Rendering of Uganda Data Center operated by Raxio
Posted in Raxio Uganda Source: Raxio
icolo's second Mombasa site under construction in 2021
Posted in Digital Realty: Mombasa MBA2 |
Outside of NSIA Technologies / PAIX in Abidjan
Posted in PAIX Abidjan |
Outside of PAIX's RackAfrica facility in Ghana
Posted in PAIX Accra (RackAfrica) Source: paix
Rendering of Teraco's CT2 facility scheduled to be completed in Q3 2021
Posted in Teraco Cape Town CT2 |
Uptime Institute Tier III Certification for Accra#1
Posted in Etix Accra #1 Source: Uptime Institute
Solar farm to support the Accra facility
Posted in Etix Accra #1 |
Mombasa facility under construction
Posted in Digital Realty: Mombasa One (MBA1) Source: icolo.io
Angonix Map
Posted in AngoNAP Luanda |
Inside a Cold Aisle Containment Pod
Posted in Equinix Lagos LG1 |
Location Total SqFt Gross SqFt Power (MW)
ST Digital: Douala DC 4,306 SqFt
NN
Djibouti Data Center (DDC)
Oceinde: Omega 1 NN

Ready to Level up Your
Data Center Strategy?