Whipcord Edge: Lethbridge

Latest Podcast 3636 30 St N
OperationalProspective Expansion
Fully operational facility with prospective expansion planned
Operated by:

Whipcord Edge: Lethbridge

Short Code: LDC01
Year Built: 2011
Utility Provider: City of Lethbridge
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Site History

  • 2010: Whipcord starts building a purpose-built data centre in north Lethbridge.
  • 2011: The first phase opens.
  • 2021: Whipcord merges with Canada15Edge to form Whipcord Edge Data Centres.

Project Profile

  • Operator: Whipcord Edge
  • Building: about 12,000 sq ft, with about 7,300 sq ft of colocation space
  • Density: up to 12.5 kW per rack
  • Status: Operational; a second phase is planned

Map and Nearby Locations

3636 30 St N
Whipcord Edge Sites
Nearby Facilities

Whipcord Edge: Lethbridge Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Whipcord Edge is a Canadian provider of mission-critical data protection services. The company ownes and operates data centres in Alberta and Ontario.

Our suite of Managed Infrastructure services include:

  • Colocation
  • VMWare based Private Cloud
  • Veeam Cloud Connect Backup
  • Disaster Recovery as a Service
  • Network Services
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Avax One Targets 10MW Behind-the-Meter Data Center in Alberta
Avax One Targets 10MW Behind-the-Meter Data Center in Alberta

Avax One Targets 10MW Behind-the-Meter Data Center in Alberta

April 11, 2026 Alberta

Cryptocurrency firm Avax One Technology has signed a front-end engineering and design (FEED) proposal for a 10MW off-grid, natural gas-powered AI and high-performance computing (HPC) data center at the 4-31 Battery site in Alberta, Canada. The FEED study will be led by BlueFlare Energy Solutions...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?