AWS UAE hit by AZ Outage after Objects Strike Data Center, Causing fire amid Iran Tensions
March 02, 2026
United Arab Emirates (UAE)
VivoPower International signed an agreement to acquire, develop, and operate a data center facility in the United Arab Emirates in January 2026 from an undisclosed seller.
Designed with a flexible modular architecture to handle power-intensive AI and secure cloud workloads, the project marks a key step in the company's "Power-to-X" pivot away from crypto mining. Backed by regional institutional investors and Gulf sovereign family offices, the campus is being developed under a powered-shell model to provide local entities with trusted, domestic control over their digital infrastructure..
| Distance | Site | About |
|---|---|---|
| 4.48 miles | Marathon Digital: Abu Dhabi 2 |
Marathon Digital Holdings and Zero Two, an emerging blockchain and digital assets infrastructure development company, established two large-scale Immersion Bitcoin Mining Facilities in Abu Dhabi.
|
| 12.25 miles | Khazna: AUH 3.1 |
Khazna's AUH 3.1 data center is located in the Khalifa Industrial Zone (KIZAD) in Abu Dhabi, United Arab Emirates.
|
| 12.31 miles | Khazna: Abu Dhabi AUH3 |
Khazna AUH3 is a hyperscale-ready data center located in the Khalifa Industrial Zone (KIZAD) in Abu Dhabi, United Arab Emirates.
|
| 14.54 miles | Pure DC: Yas Island 1 |
Pure Data Centres Group operates AUH01 Building 1, a live hyperscale data center facility on Yas Island in Abu Dhabi, United Arab Emirates.
|
| 14.79 miles | Pure DC: Yas Island 2 |
Pure Data Centres Group is developing AUH01 Building 2 on Yas Island in Abu Dhabi as the next expansion phase of its hyperscale AUH01 campus.
|
| 15.00 miles | Hyperscale Data Center Request Dataset |
G42, OpenAI, Oracle, NVIDIA, SoftBank Group, and Cisco are partnering to build Stargate UAE, a next-generation AI infrastructure cluster in Abu Dhabi.
|
| 15.00 miles | G42: UAE-US AI Campus |
US President Donald Trump and UAE President Sheikh Mohamed bin Zayed al-Nahyan have unveiled plans for a 10-square-mile AI data center campus in Abu Dhabi.
|
| 15.06 miles | Khazna: Masdar AUH8 |
Khazna is constructing a new data center in the Masdar City of UAE. The site is expected to be completed in August 2026.
|
| 15.06 miles | Marathon Digital: Abu Dhabi 1 |
Marathon Digital Holdings and Zero Two, an emerging blockchain and digital assets infrastructure development company, established two large-scale Immersion Bitcoin Mining Facilities in Abu Dhabi.
|
| 15.56 miles | Equinix Abu Dhabi AD1 | |
| 15.59 miles | Khazna: Abu Dhabi AUH1 |
Khazna AUH1 is a data center located in Masdar City, Abu Dhabi.
|
| 15.63 miles | Khazna: Abu Dhabi AUH6 |
Khazna Data Centers has launched a new data center AUH6 in Masdar City, Abu Dhabi, United Arab Emirates (UAE).
|
| 17.70 miles | Khazna: Mafraq AUH4 |
Khazna is constructing a data center in the Mafraq City of UAE. The site is expected to be completed in late December 2026.
|
VivoPower International PLC (Nasdaq: VVPR) is a sustainable energy and digital infrastructure company operating across North America, Europe, the Middle East, Southeast Asia, and Australia.
The Company develops and operates renewable-powered infrastructure enabling Power-to-X applications, with a strategic focus on sovereign digital and AI infrastructure, electric mobility, and energy-intensive compute.
March 02, 2026
United Arab Emirates (UAE)
February 07, 2026
United Arab Emirates (UAE)
January 30, 2026
United Arab Emirates (UAE)
January 15, 2026
United Arab Emirates (UAE)
August 15, 2025
United Arab Emirates (UAE)
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas