Vaultica: GEN01

Latest Podcast Chemin du Pré-Fleuri 20
Operational
Fully operational facility
Operated by:

Vaultica: GEN01

Short Code: GEN01
Year Built: 2002
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Safe Host opened GEN01 in 2002 as SH1, its first data center. IPI Partners bought Safe Host in 2022 and folded it into STACK. Apollo-managed funds bought the site in 2025, and it now operates as Vaultica. The site has a dual utility feed rated 13.2 MVA and runs on hydro power.

Map and Nearby Locations

Chemin du Pré-Fleuri 20
Vaultica Sites
Nearby Facilities

Vaultica: GEN01 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vaultica: GEN01

Distance Site About
2.97 miles Lumen Geneva
2.97 miles Equinix Geneva GV2
3.18 miles Equinix Geneva GV1
3.30 miles ECL: Geneva
4.64 miles nLighten: Geneva
In April 2024, nLighten acquired the site from Exa Infrastructure.
4.66 miles CapitaLand: Geneva
Chemin de L’Epinglier is a three-storey modern concrete data centre facility (triple net powered shell). The site is in close proximity to Geneva’s CBD, located approximately 7 km to the east.
4.89 miles NorthC: Geneva
European operator NorthC has announced plans to break ground on its sixth Swiss data center in the first quarter of 2026.
5.45 miles CERN: Meyrin
CERN operates a data center in Geneva.
18.70 miles Vaultica: Gland GEN02
Vaultica sells carrier-neutral colocation inside STACK's GEN02 data center in Gland, between Geneva and Lausanne. The business was part of STACK until Apollo-managed funds bought it in 2025.
18.70 miles Stack: GEN02
STACK's GEN02 is a large carrier-neutral data center in Gland, between Geneva and Lausanne. Safe Host opened it in 2017 as SH2 and it became STACK in 2022. Vaultica also sells colocation in the building.
18.83 miles Stack: GEN03
STACK's GEN03 is a planned data center on Route des Avouillons in Gland, between Geneva and Lausanne, beside its GEN02 building. STACK filed the building permit in 2025.

Vaultica: GEN01 Data Center Photos See all

Exterior Gland data center
Source: Baxtel

Operating Company

Operated by:

Vaultica runs carrier-neutral enterprise colocation in five European metros: Milan, Geneva, Copenhagen, Stockholm and Oslo. Its seven data centers serve telecom carriers, IT and cloud providers, and financial institutions. At MIL01 in Siziano and GEN02 in Gland, it sells colocation inside buildings that STACK still runs. It is building MIL03 in Settimo Milanese and plans MAD01 in Alcalá de Henares, near Madrid.

Infrastructure funds managed by Apollo own the company. Apollo agreed on 29 April 2025 to buy STACK Infrastructure's European colocation business from Blue Owl Digital Infrastructure. The carve-out closed on 13 August 2025. STACK had set up the colocation unit in 2024, and it kept its European hyperscale business. The carved-out business launched as Vaultica on 10 December 2025.

Leadership

  • Sherif Rizkalla, CEO. He led SUPERNAP Italia from 2019, then STACK's Italian and Swiss business, then STACK EMEA's enterprise colocation unit.
  • Roger Semprini, Group Chief Commercial Officer since December 2025. He was previously managing director of Equinix Switzerland.

Predecessor brands

  • DigiPlex (Nordics): Byrne Murphy and Bill Conway bought the Norwegian operator in 2001. DigiPlex built the Oslo, Stockholm and Copenhagen sites. IPI Partners bought it in 2021.
  • Safe Host (Geneva): Gérard Sikias founded it in 2000. Safe Host built the two Geneva-area sites. IPI Partners agreed to buy it in May 2022.
  • SUPERNAP Italia (Milan): Switch, Accelero Capital and Orascom TMT Investments formed SUPERNAP International in 2014. Its Italian arm built the Siziano campus from 2015. IPI Partners bought control in February 2021.

IPI Partners merged DigiPlex and SUPERNAP Italia into STACK EMEA in March 2022 and later added Safe Host.

History

  • 2026: Joined the CERN Internet Exchange Point in July.
  • 2026: Announced MAD01 in Alcalá de Henares, near Madrid, on 28 April.
  • 2026: Broke ground on MIL03 in Settimo Milanese on 12 March.
  • 2025: Launched as Vaultica on 10 December.
  • 2025: Apollo funds agreed on 29 April to buy STACK's European colocation business and closed on 13 August.
  • 2024: STACK formed a separate enterprise colocation unit in EMEA.
  • 2022: IPI Partners agreed in May to buy Safe Host.
  • 2022: DigiPlex and SUPERNAP Italia rebranded as STACK EMEA in March.
  • 2021: IPI Partners agreed in July to buy DigiPlex and closed in August.
  • 2021: IPI Partners bought control of SUPERNAP Italia in February.
  • 2018: DigiPlex took over Telia's Copenhagen data center in May, with Telia as anchor customer.
  • 2017: Safe Host opened its Gland data center in May.
  • 2016: SUPERNAP Italia opened the Siziano campus; DigiPlex opened its Stockholm data center.
  • 2015: Construction started at Siziano in July.
  • 2013: DigiPlex bought 7 hectares in Upplands Väsby for its Stockholm site.
  • 2010: DigiPlex opened Rosenholm, Oslo.
  • 2002: Safe Host opened its first data center, in Plan-les-Ouates.
  • 2001: DigiPlex took over the Ulven data center in Oslo.
  • 2000: Gérard Sikias founded Safe Host in Geneva.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?