Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 0.00 miles | Equinix Geneva GV2 | |
| 2.12 miles | nLighten: Geneva |
In April 2024, nLighten acquired the site from Exa Infrastructure.
|
| 2.14 miles | CapitaLand: Geneva |
Chemin de L’Epinglier is a three-storey modern concrete data centre facility (triple net powered shell). The site is in close proximity to Geneva’s CBD, located approximately 7 km to the east.
|
| 2.24 miles | Equinix Geneva GV1 | |
| 2.31 miles | ECL: Geneva | |
| 2.34 miles | NorthC: Geneva |
European operator NorthC has announced plans to break ground on its sixth Swiss data center in the first quarter of 2026.
|
| 2.80 miles | CERN: Meyrin |
CERN operates a data center in Geneva.
|
| 2.97 miles | STACK GEN01 |
|
| 16.27 miles | STACK Gland GEN02 |
Formerly known as SafeHost SH2 Gland.
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
April 15, 2024
Lumen Technologies
November 10, 2023
Lumen Technologies
October 16, 2023
Lumen Technologies
August 03, 2023
Lumen Technologies
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas