This data center was a former Tonaquint facility. US data center firm Tonaquint rebranded to ValorC3 Data Centers in 2025. The Tonaquint group began construction in the third quarter of 2007 and concluded in the third quarter of 2008. The data center became operational in October 2008, and the building is located in the Tonaquint Business Park.
Power:
- Utility: City Power
- Most Economical Power in the region.
- 25MW primary substation.
- 15MW secondary substation.
- Total power plant 4MW.
- FUEL TANK: Currently, 6,000+ gallons on site. Fuel storage for minimum 48-hr run time.
- GENERATORS:
- Three (3) 2MW Caterpillar generators and eight (8) 750KVA Liebert UPS units.
- Entire generator plant designed at N+1 redundancy.
Building:
- FLOOR LOAD: Typical structural capacity of 1,250 pounds per sqft.
- FIRE SUPPRESSION:
- VESDA (Very Early Smoke Detection Alarm) above and below floor.
- Double interlock pre-action throughout.
- HVAC:
- DX30 ton computer room air conditioner units.
- N+1 redundancy on all systems.
- CEILING HEIGHTS: Typically finished 10 feet from raised floor.
- LOADING AREA: Secure enclosed loading area.
Networks:
- Zayo (360 Networks)
- UTOPIA
- Tonaquint
- CenturyLink (Qwest)
- Interlinx
- South Central
- Level(3) Communications
- Integra Telecom