Operational
Fully operational facility
Operated by:

Soluna: Project Dorothy 2

Short Code: Dorothy 2
Year Built: 2025
░░░░ Request Dataset MW
Total Power

Crypto Mining Data Center Soluna's Project Dorothy 2 is co-located at a wind farm in Texas. Project Dorothy 2 is the second phase of Soluna’s flagship Project Dorothy 1 facility. Project Dorothy 2 is the home of Soluna’s Bitcoin Hosting expansion and its new 2 MW specialized AI data center, called Helix.

In September 2024, Soluna announced the groundbreaking of its Dorothy 2 project in Texas. The first phase of Project Dorothy 2 was energized in March 2025 and the second phase became operational in Q4 2025.

Map and Nearby Locations:

This Facility
Soluna Sites
Nearby Facilities

Sites within 15 miles of East

Distance Site About
0.13 miles Crypto Mining Data Center Request Dataset
Crypto Mining Data Center Soluna's Project Dorothy 1B is a 25 megawatt data center situated in close proximity to a wind farm in the Electric Reliability Council of Texas West territory.
0.16 miles Crypto Mining Data Center Request Dataset
Crypto Mining Data Center Soluna's Project Dorothy 1A is a 25 megawatt data center situated in close proximity to a wind farm in the Electric Reliability Council of Texas West territory.
3.68 miles Crypto Mining Data Center Request Dataset
Project Grace is an AI pilot project in development, part of Soluna's transition into HPC and machine learning.

East Data Center Photos (See all)

Operating Company

Operated by:

Soluna harnesses the power of computing to accelerate the renewable energy future. Our data centers can buy every excess megawatt to use for batch-oriented, computing-intensive processes such as cryptocurrency mining or machine learning, and this solution is as low-risk and low-friction to use as a smartphone.

12
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?