Planned
Future facility in planning stage
Operated by: R&L Capital, Inc

R&L Capital: RBIDC

Site planned for 2028 and has expansions through 2029
Lot Size: 50 acres

The RB Inyokern Data Center is a proposed single-story data center on a roughly 50-acre site in Inyokern, an unincorporated area of Kern County, California, developed by R&L Capital. The design includes six data halls using both liquid and air cooling, a dedicated on-site substation fed by Southern California Edison, and diesel backup generation with on-site fuel storage. The project is under review by the California Energy Commission through a Small Power Plant Exemption and has drawn substantial local opposition, particularly over its projected groundwater use in the water-stressed Indian Wells Valley basin, alongside concerns from a nearby naval installation, the local airport, and area residents. As of the most recent reporting, construction had not begun.

Map and Nearby Locations

Ridgecrest
R&L Capital, Inc Sites
Nearby Facilities

R&L Capital: RBIDC Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by: R&L Capital, Inc

R&L Capital, Inc. is a small, privately held real estate and energy development company based in Trona, an unincorporated community in San Bernardino County, California. The company has a limited public profile, with no disclosed corporate website, named leadership, or ownership details available. Its known track record centers on energy and infrastructure development in California's Indian Wells Valley region, including a previously developed solar project serving the Inyokern area.

0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?