Go to PodcastTexas Solarworks proposed a data center on farmland near Northeast Loop 289 in Lubbock, planned around an on-site solar farm, natural gas generation and a grid connection. Neighborhood opposition stopped it before it reached the City Council.
| Distance | Site | About |
|---|---|---|
| 0.89 miles | CORVA: Project Infrared |
CORVA Infrastructure Services plans a carrier-neutral data center next to Lubbock Power & Light's Northeast Substation in Lubbock, Texas.
|
| 1.97 miles | Verizon Wireless: Lubbock MSC |
Verizon Wireless operates a mobile switching center in Lubbock Business Park in Lubbock, Texas.
|
| 3.97 miles | AT&T: Lubbock Main |
AT&T's main central office in downtown Lubbock, Texas, houses the company's local telephone switching and network equipment.
|
| 4.14 miles | Lumen Lubbock 1 |
Lumen Lubbock 1 is a small colocation and network facility run by Lumen Technologies in downtown Lubbock, Texas.
|
| 4.36 miles | Duos: Lubbock EDC |
Duos Edge AI operates a modular edge data center in central Lubbock, Texas, opened in 2026.
|
| 5.44 miles | Verizon: Lubbock |
Verizon operates a network data center on Avenue A in Lubbock, Texas.
|
| 7.43 miles | AT&T: Lubbock 34th St |
AT&T runs a telephone exchange at 4402 34th St in Lubbock, Texas.
|
| 7.45 miles | AT&T: Lubbock 82nd St |
AT&T runs a telephone exchange at 1601 82nd St in Lubbock, Texas.
|
| 11.38 miles | AT&T: Lubbock Frankford |
AT&T runs a telephone exchange at 9801 Frankford Ave in Lubbock, Texas.
|
| 13.92 miles | Reese Technology Center: Reese Data Center |
The Reese Data Center is a small carrier-neutral colocation facility at the Reese Technology Center business park west of Lubbock, Texas.
|
| 17.60 miles | Aligned: LBB-04 |
This facility is part of Aligned's Abernathy Campus in Texas.
|
| 17.65 miles | Aligned: LBB-06 |
This facility is part of Aligned's Abernathy Campus in Texas.
|
| 17.65 miles | Aligned: LBB-05 |
This facility is part of Aligned's Abernathy Campus in Texas.
|
| 17.66 miles | Aligned: LBB-03 |
This facility is part of Aligned's Abernathy Campus in Texas.
|
| 17.74 miles | Aligned: LBB-02 |
This facility is part of Aligned's Abernathy Campus in Texas.
|
| 17.86 miles | Lambda: Abernathy LBB-01 |
Lambda is the occupant of Aligned Data Centers' LBB-01 building at the Project Caprock campus near Abernathy, Texas.
|
| 17.86 miles | Aligned: LBB-01 |
Aligned: LBB-01 is the first building of Aligned Data Centers' Project Caprock campus near Abernathy in Hale County, Texas, now under construction.
|
| 18.28 miles | Hyperscale Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 18.28 miles | Fluidstack: Abernathy Campus |
Fluidstack's Abernathy Campus is an AI data center under construction near Abernathy, Texas, on land leased from Aligned Data Centers next to Xcel Energy's TUCO substation.
|
| 18.87 miles | Energy Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.