PCK-DataCross: Križ

Latest Podcast Ul. Ljudevita Gaja 19
Operational
Fully operational facility
Operated by:

PCK-DataCross: Križ

Year Built: 2016
░░░ Request Dataset MW
Total Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size
  • 1,600 m2 to accommodate the anticipated IT equipment
  • SLA (Tier4) availability of 99.995%
  • Two different power transmission line loops
  • Redundant transformer facilities 6MW
  • Redundant power switching nodes
  • Diesel engines with 4 x 1.6 MW synchronous operation (guaranteeing the oDC’s 72 hours autonomy at full load)
  • Two grids of power (A + B) both powered from the UPS system (2N +1)

Map and Nearby Locations

Ul. Ljudevita Gaja 19
PCK-DataCross (Podatkovni centar Kriz) Sites
Nearby Facilities

PCK-DataCross: Križ Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Podatkovni centar Križ (PCK) or DATACROSS was formed with a goal to build, manage and maintain enterprise class data centers aligned with the highest global standards. Podatkovni centar Križ was created in 2009 and during its development focus was on preparations for the construction of data centers in specific locations (land acquisition, obtaining permits and approvals, etc).

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read A1 Croatia opens a Tier III Zagreb data center
Baxtel

A1 Croatia opens a Tier III Zagreb data center

December 02, 2021 Zagreb

A1 Croatia has opened a new data center in Zagreb. The company began construction on the facility in October 2020. The 21,500 square feet (2,000 square meters) data center cost the company €11 million ($13m). In addition, the data center was designed to withstand earthquakes up to 9 on the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?