NEXTDC: Newman NE1

Latest Podcast
96 Woodstock St
Operational
Fully operational facility
Operated by:

NEXTDC: Newman NE1

Year Built: 2025
░░░ Request Dataset MW
Total Power
░░░░░ Login to view SqFt
Gross Colocation Size

NEXTDC's NE1 Newman represents the company's second Edge data center in the Pilbara region. Construction of this facility commenced in early fiscal year 2024, following the acquisition of the land. This facility features 560 square meters of technical space with the capacity to accommodate 250+ racks.

NE1 Newman Features


• Multiple power distribution units with minimum N+N redundancy
• Full N+1 main electrical infrastructure extending to N+N at power rail level
• 2 x 400kVA MTU backup diesel generators, with space for multiple generators for growth
• Minimum 18 hours onsite fuel supply
• N+1 high efficiency condenser
• N+1 in row cooling with UPS redundancy
• Diverse connectivity and underground cable pathways to the building
• PH1 site hosts the Vocus Horizon terrestrial cable

Map and Nearby Locations:

96 Woodstock St
NEXTDC Sites
Nearby Facilities

NEXTDC: Newman NE1 Data Center Photos (See all)

Rendering of NEXTDC NE1 Newman Data Center
Source: NEXTDC

Operating Company

Operated by:

NEXTDC is an ASX200-listed technology company enabling business transformation through innovative data centre outsourcing solutions and connectivity services.

As Australia’s leading independent data centre operator, the company is one of the largest providers in Australia.

26
Facilities
5
Markets
289MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?