Møre og Romsdal Data Center Market

Latest Podcast
Møre og Romsdal is a small market on Norway's northwest coast, led by a Bitdeer bitcoin mine near Molde. Planned AI data centres wait on grid capacity and municipal approvals. Read More

Market Facts

Møre og Romsdal Data Center Map

Møre og Romsdal Power Growth Over Time

+241% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Møre og Romsdal

BitDeer
Site
Power
Operational
1
20.4
Construction
0
Planned
0
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Pega Nordic
Site
Power
Operational
1
8.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Tussa
Site
Power
Operational
1
0.5
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Magnora
Site
Power
Operational
0
0.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
3
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
0
View Provider

Largest Data Centers in Møre og Romsdal

Location About Total SqFt Power (MW)
BitDeer: Molde, Norway
Bitdeer's Molde data center is a containerized cryptocurrency mining site run by its subsidiary T...
NN Request Dataset
Pega Nordic: Sunndalsøra
Pega Nordic runs a server park in the Krokvollen gravel pit in Litldalen, near Sunndalsøra in Sun...
NN Request Dataset
Tussa: Ørsta
Tussa IKT runs a Tier III data center in Ørsta, Møre og Romsdal, Norway, for its private cloud an...
NN Request Dataset
Magnora: Scale Averøya 1
Scale Averøya 1 is the planned 10 MW first phase of Magnora's AI data center campus at Averøy Ind...
Magnora: Scale Averøya Expansion
Scale Averøya Expansion holds the planned 84 MW second phase of Magnora's AI data center campus a...

About This Metro

Overview

Møre og Romsdal, on the northwest coast of Norway, is a small data centre market. Bitcoin mining arrived in 2019 for cheap power, and local utilities run small data centres for business customers. Since late 2025 developers have proposed AI data centres around Kristiansund, Surnadal and Ålesund.

The Market Today

Bitdeer's site at Elnesvågen, north of Molde, is the largest in operation. It has mined bitcoin since 2019. Bitdeer bought it in April 2024 and is assessing a conversion to AI. Pega Nordic has run a server park at Sunndalsøra since December 2023. It must move, because Statnett will build a transformer station on the plot. Tussa, a local utility, has run a data centre in Ørsta since 2015.

Magnora plans an AI campus at a former oil base on Averøy and a second site in Surnadal. Fjordcore, set up by the utility Tafjord, plans a data hall beside a district heating plant in Ålesund. Salmon farmer Salfjord has applied to build a data centre on its fish farm plot at Tjeldbergodden in Aure.

Advantages

  • Grid stations. Three 420 kV lines meet at Statnett's new Surna station, next to Magnora's Surnadal site.
  • Heat users. The Averøy, Aure and Ålesund plans send waste heat to fish farms and district heating.

Challenges

  • Grid access. Magnora's and Fjordcore's sites hold queue places, not reserved capacity. Statnett paused new data-centre reservations in November 2026.
  • Local approvals. In November 2026 Ålesund's planning committee stopped Tafjord's plan for a large AI data centre at Sjøholt. Aure postponed Salfjord's application in October 2026.

Power and Policy

Statnett runs the transmission grid. Linja distributes power in Sunnmøre, Mellom on Averøy and in Aure, and Elinett in Hustadvika. The county lies in NO3, the central bidding zone.

Get Quotes

Related News See all

Read Magnora Data Center Acquires 2MW Operating Oslo Site With Blix Group
Magnora Data Center ASA has acquired [an operating data center in Oslo](https://kommunikasjon.ntb.no/announcement/19111297?lang=en) from an international telecom operator, adding u![commons.wikimed...

Magnora Data Center Acquires 2MW Operating Oslo Site With Blix Group

October 21, 2026 Magnora

Magnora Data Center ASA has acquired an operating data center in Oslo from an international telecom operator, adding up to 2MW of IT load. The seller is not named, and financial terms were not disclosed. Magnora Data Center owns 75 percent of the facility, and Blix Group AS, the owner of...

Read more
Read Bitdeer AI Secures 65MW Data Center Lease In Johor, Malaysia
Bitdeer AI has signed a 10-year data center services agreement for the 65.1MW A202 facility in Johor Bahru, Malaysia. The liquid-cooled facility will host Nvidia GB300 and NVL72 systems and is Bitd...

Bitdeer AI Secures 65MW Data Center Lease In Johor, Malaysia

September 18, 2026 BitDeer

Bitdeer AI has signed a 10-year data center services agreement for the 65.1MW A202 facility in Johor Bahru, Malaysia. The liquid-cooled facility will host Nvidia GB300 and NVL72 systems and is Bitdeer’s largest single capacity addition in Southeast Asia. Located alongside the 21.7MW A201...

Read more
Read Magnora Partners On Estonia Data Center Projec
European data center developer Magnora has acquired a 50 percent stake in the Risti Kampus data center project in Estonia through a joint venture with energy company Sunly AS. Located 60km south of...

Magnora Partners On Estonia Data Center Projec

September 17, 2026 Magnora

European data center developer Magnora has acquired a 50 percent stake in the Risti Kampus data center project in Estonia through a joint venture with energy company Sunly AS. Located 60km south of Tallinn, the campus could deliver 180MW in its first phase and eventually reach 400MW. It will...

Read more
Read Bitdeer Acquires 200 Acres In Milam County, Texas, For AI And HPC Expansion
Bitdeer has acquired a 200-acre site in Milam County, Texas, for $100 million to support its AI and HPC infrastructure expansion. The land, formerly part of an Alcoa aluminum smelting plant, is adj...

Bitdeer Acquires 200 Acres In Milam County, Texas, For AI And HPC Expansion

September 05, 2026 BitDeer

Bitdeer has acquired a 200-acre site in Milam County, Texas, for $100 million to support its AI and HPC infrastructure expansion. The land, formerly part of an Alcoa aluminum smelting plant, is adjacent to Bitdeer’s existing Rockdale data center. The company said the combined sites provide 563MW...

Read more
Read Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project
Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project

Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project

May 18, 2026 Magnora

Norwegian renewables and data center developer Magnora ASA has secured land for a new 30 MW data center project in the Milan area, the company announced on Monday. The wholly owned project is Magnora's second in Italy and brings its data center development portfolio to 585 MW gross and 460 MW...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...