LCL Opens New Data Center in Brussels, Belgium
March 27, 2026
LCL Belgium n.v.
| Distance | Site | About |
|---|---|---|
| 6.34 miles | EdgeConneX: Brussels |
EdgeConneX's first Belgian data center campus is located in Ternat, under 15km from Brussels.
|
| 11.14 miles | Penta Infra: BRU01 |
The facility is situated in the Green Energy Park in Zellik and features a nine-story data center spanning 10,000 square meters (107,639 sq ft).
|
| 12.87 miles | nLighten: Ghet |
|
| 15.68 miles | DC United: Evere |
In 2024, Belgian telco Proximus sold its data centers to local operator Datacenter United (DC United). This data center was part of the acquisition.
|
| 15.98 miles | KevlinX: Brussels BRU01 |
European data center firm KevlinX has broken ground on its debut facility in Brussels, Belgium. The 25,400 sqm campus will be built in two phases.
|
| 16.09 miles | Ark: Brussels Campus |
Ark Data Centres is expanding into Europe with a new two-building data center campus in Brussels.
|
| 16.75 miles | Lumen Brussels | |
| 16.78 miles | DC United: Machelen II |
In 2024, Belgian telco Proximus sold its data centers to local operator Datacenter United (DC United). This data center was part of the acquisition.
|
| 17.32 miles | DC United: Ghent |
Datacenter United acquired the facility, along with DC Star's Burcht and Oostkamp sites, in 2022.
|
| 18.08 miles | Verizon Brussels H and E | |
| 18.26 miles | DC United: Brussels |
Datacenter United's Brussels facility is a 1,200 sqm, two-story building in Zaventem, northeast of Brussels.
|
| 18.27 miles | LCL Diegem | |
| 19.32 miles | Digital Realty: Brussels BRU1 |
BRU1 was previously operated by Interxion
|
March 27, 2026
LCL Belgium n.v.
October 25, 2023
LCL Belgium n.v.
October 31, 2022
Brussels
December 02, 2021
LCL Belgium n.v.
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas